48
4. When preventive maintenance procedures are complete
ed, open the manual shut off valve to restore com-
pressed air to the equipment. The manual shut off valve
is in the “Open” position as shown in Fig. 4 at the right.
(See top illustration at the right)
5. Remove lock out and tag and restore electrical power to
the equipment. The lock and tag should only be
removed by the person who placed it.
PREVENTIVE MAINTENANCE PROCEDURE
CHALLENGER Series II
Содержание Challenger II 12 COLOR
Страница 4: ......
Страница 6: ......
Страница 8: ......
Страница 82: ...Leveling the Pallets M R Printing Equipment Inc Glen Ellyn Illinois 74 NOTES Challenger II mrprint com...
Страница 88: ...Idec Relay Identification NOTES 80 Challenger II mrprint com...
Страница 120: ...R Re ep pl la ac ce em me en nt t P Pa ar rt ts s M R Printing Equipment Inc Glen Ellyn Illinois 60137 U S A 112...
Страница 121: ...Challenger b...
Страница 122: ......
Страница 127: ...NEW BALL SCREW INDEX DRIVE ASSEMBLY Revised 12 27 00...
Страница 128: ......
Страница 129: ......
Страница 130: ......
Страница 131: ......
Страница 132: ...Challenger b...
Страница 133: ......
Страница 138: ......
Страница 139: ......
Страница 140: ......
Страница 141: ......
Страница 142: ......
Страница 143: ......
Страница 144: ......
Страница 145: ......
Страница 146: ......
Страница 147: ......
Страница 148: ......
Страница 149: ......
Страница 150: ......
Страница 151: ......
Страница 152: ......
Страница 153: ......
Страница 154: ......
Страница 155: ......
Страница 156: ......
Страница 157: ......
Страница 158: ......
Страница 159: ......
Страница 160: ......
Страница 161: ......
Страница 162: ......
Страница 163: ......
Страница 164: ......
Страница 165: ......
Страница 166: ......
Страница 167: ......
Страница 168: ......
Страница 169: ......
Страница 175: ......