394
AO2 terminal ................................................... 28
Over Current ....................................................... 335
Over Current1 .................................................... 338
Over Load ............................................................. 335
Over Speed .......................................................... 336
Over Voltage ....................................................... 335
overheat
inverter overheat detection ................. 287
overload
overload warning level ........................... 285
overload ................................................................. 285
overload
overload warning time ........................... 285
overload
overload limit ............................................... 287
overshoot prevention .................................... 252
overspeed fault detection .......................... 284
P
P (+) terminal ........................................................ 20
PAR (Parameter group) ................. 58, 83, 143
parameter ........................................................ 60, 61
duplicating parameter settings ......... 145
encoder-related parameters ............... 152
parameter initialization ........................... 144
parameter label setting ............................. 61
parameter lock ............................................ 146
parameter value setting............................ 60
setting the password ............................... 146
Parameter group Refer to
PAR
(Parameter
group)
parameter initialization ................................. 144
part names ................................................................ 4
parts illustrated ....................................................... 4
peripheral devices ........................................... 373
phase-to-phase voltage .............................. 353
PNP mode (Source) .......................................... 45
PNP/NPN mode selection switch (SW1)
NPN mode (Sink) ......................................... 46
PNP mode (Source) .................................... 45
pole position detection current .............. 165
pole position detection voltage ............. 165
post-installation checklist ............................... 48
potentiometer ....................................................... 27
power terminal board wiring ...................... 18
power terminals
B1/B2 terminals ............................................. 20
N (-) terminal .................................................. 20
P (+) terminal .................................................. 20
R/S/T terminals .............................................. 20
U/V/W terminals ........................................... 20
pre-excitation ..................................................... 176
pre-excitation time ................................... 188
preparing the installation ................................. 2
product identification .......................................... 2
product specification details ..................... 369
Protection group Refer to
PRT (Protection
group)
protocol
LS INV RS232 protocol .......................... 303
Содержание LSLV-L100 Series
Страница 16: ...3 Preparing the Installation Preparation ...
Страница 36: ...Installing the Inverter 23 Installation Power terminal and control terminal wiring diagram ...
Страница 240: ...Detailed operation by function groups 227 Operation Details BX time FUN_51 set to a value other than 0 ...
Страница 252: ...Detailed operation by function groups 239 Operation Details stops When forward operation has a lighter load ...
Страница 339: ...326 Communication features CAN message frame versions CAN 2 0A CAN 2 0B ...
Страница 395: ...382 ...