Detailed operation by function groups
241
O
p
er
ati
o
n
D
etai
ls
Loss of battery run signal during ALLS:
The battery run signal must be ON and FUN_69 (ALLS Enable) must be set to
“YES” for ALLS to run. If the battery run signal is OFF during ALLS, the inverter
output is immediately blocked, the motor decelerates at free-run, and then stops.
If the battery run signal is OFF during ALLS, a “BatRun Fault” occurs.
6.5.12 Automatic load cell calculation
Automatic load cell calculations allow for easy configuration of related
parameters when an improvement is required to correct operational problems
including roll-backs. When you operate the inverter with a load cell, full-load
climbing and no-load descending operations must be performed to correctly
configure the related parameters.
6.5.12.1 Preparing a load cell calculation
Connect the load cell output (0–10 V) to V1-GND terminal.
Ensure that the load cell signals are correctly output during inverter
operation.
If any incorrect load cell signals are noticed, eliminate signal noise to correct
it.
Keypad display
Description
Set AiO_01 to “Torque Bias”.
Set AIO_02 to “0–10 V”.
For AIO_03 through AIO–10, use the default setting values unless
adjustments are necessary.
Содержание LSLV-L100 Series
Страница 16: ...3 Preparing the Installation Preparation ...
Страница 36: ...Installing the Inverter 23 Installation Power terminal and control terminal wiring diagram ...
Страница 240: ...Detailed operation by function groups 227 Operation Details BX time FUN_51 set to a value other than 0 ...
Страница 252: ...Detailed operation by function groups 239 Operation Details stops When forward operation has a lighter load ...
Страница 339: ...326 Communication features CAN message frame versions CAN 2 0A CAN 2 0B ...
Страница 395: ...382 ...