Installation
42
■
Connecting the Electrical Supplies
The system should have its own dedicated electrical supply, unless the line supply is known to
be clean. The earth should be robust, of low impedance and noise free. This section provides
some guidance on connecting an electrical supply.
■
Checking Guards
The system should have its own dedicated electrical supply, unless the line supply is known to
be clean. The earth should be robust, of low impedance and noise free. This section provides
some guidance on connecting an electrical supply.
■
Checking Belt Tracking
The system should have its own dedicated electrical supply, unless the line supply is known to
be clean. The earth should be robust, of low impedance and noise free. This section provides
some guidance on connecting an electrical supply.
■
Setting Up Reject Mechanisms
The conveyor system is supplied with the reject mechanism correctly set up. Normally no
further adjustment should be required.
■
Remote User Interface
The electronic controls for the metal detector are integrated into the search head along with
the user interface, but the user interface can be mounted remotely in it‘s own housing where
access would otherwise be difficult.
■
Installing a Serial Link
In order to use any of the serial link options your detector will require a cable and connector
assembly which facilitates external connection to the on board serial link electronics.
Warnings
The following safety warnings apply when installing an IQ
3
+ Metal Detector head:
1. LETHAL HAZARD – ELECTRICAL SUPPLIES
2. LETHAL HAZARD – COMPRESSED AIR SUPPLIES
3. NON-IONIZING RADIATION
4. WORKING ON EQUIPMENT
5. REJECT DEVICES
6. EXCESSIVE NOISE
7. HEAVY EQUIPMENT
8. LIFTING THE MACHINE
9. MOVING THE MACHINE
10. CONTAMINANTS
For details see the
Safety Warnings
section.
The following emergency procedures apply to these procedures:
2. DEALING WITH FIRE.
For details see the
Emergency Procedures
section.
Содержание IQ3+
Страница 2: ......
Страница 36: ...Safety First 26 THIS PAGE IS INTENTIONALLY LEFT BLANK ...
Страница 43: ...Installation 33 ...
Страница 60: ...Installation 50 THIS PAGE IS INTENTIONALLY LEFT BLANK ...
Страница 70: ...About the Metal Detector Range 60 THIS PAGE IS INTENTIONALLY LEFT BLANK ...
Страница 218: ...Operating Instructions 208 THIS IS PAGE INTENTIONALLY LEFT BLANK ...
Страница 244: ...Maintenance 234 THIS PAGE IS INTENTIONALLY LEFT BLANK ...
Страница 248: ...Glossary 238 THIS PAGE IS INTENTIONALLY LEFT BLANK ...