CF_Rooftop_DOAS_3_17
Startup Form
Before starting the unit, ensure that all applicable items in the Pre-Startup Checklist have been
completed and verified. Compressor crankcase heaters must be energized for a minimum of twelve (12)
hours before operating the unit.
Electrical
Unit Voltage:
_____________________
Line Voltage:
____________________________
L1 - L2:
_________________
L2 - L3:
________________
L3 - L1:
__________________
Supply and Exhaust Fans
Component
Nameplate
Amps
Running Amps
Rotation
Direction
VFD Speed
(Hz)
Shaft Speed
(RPM)
L1
L2
L3
Supply Fan No. 1
Supply Fan No. 2
Supply Fan No. 3
Exhaust Fan No. 1
Exhaust Fan No. 2
Exhaust Fan No. 3
Refrigeration
Component
Nameplate
Amps
Running Amps
Rotation
Direction
L1
L2
L3
Condensing Fan No. 1
Condensing Fan No. 2
Condensing Fan No. 3
Condensing Fan No. 4
Condensing Fan No. 5
Condensing Fan No. 6
Condensing Fan No. 7
Condensing Fan No. 8
Compressor A1
Crankcase Amps = _____
Compressor A2
Crankcase Amps = _____
Compressor B1
Crankcase Amps = _____
Compressor B2
Crankcase Amps = _____
Other
Component
Nameplate Amps
Running Amps
L1
L2
L3
Energy Recovery Wheel