CF_Rooftop_DOAS_3_17
Pre-Startup Checklist
The following items should be checked on all units before startup.
Gas piping is complete and gas lines are purged.
Gas venting is in place.
Exterior and Interior Inspection
Unit is inspected for rigging or shipping damage.
Report any damage to the installing contractor or shipping
company and to the manufacturer.
Unit is installed correctly, is level, and all doors are operable.
Unit is secured to curb or mounting supports.
Doors operate smoothly and gaskets are in place.
Door handles are tightened to ensure complete gasket
seal.
All shipping blocks, tie downs, and bolts are removed.
Condensate drain is piped and trapped.
Condensate drains are primed.
External ductwork is completed and correctly installed.
Outdoor air intake hood is installed, bird screen is in place,
and opening is unobstructed.
Copper tubing is secured and not rubbing.
Filters are installed correctly.
Controls and Electrical
The main disconnect is off.
All field-mounted sensors and instruments are installed and wired.
Unit controls are off.
Electrical service matches unit voltage.
Electrical field wiring is complete.
All electrical connections are tightened.
Compressor and motor breakers or fuses are open
(disabled).
Main power is wired to the disconnect.
Discharge air sensor is installed per the Wiring instructions in the Rooftop DOAS Installation Manual.
Space temperature and humidity sensors are installed per the Wiring instructions in the Rooftop DOAS Installation Manual.
Turn on power, check phase voltage monitor to make sure indicator light is green. If indicator light is red, verify voltage and phase
is not reversed.
Fans and Motors
Fan inlets and outlets are unobstructed.
Fasteners, setscrews, and locking collars on the fan are
secure.
Fasteners on the motor and base are secure.
Fan wheel rotates freely by hand and no parts are rubbing.
Electrical connections are properly secured.
Housing and ductwork, if accessible, are cleared of obstruc-
tions and foreign material that may damage the fan wheel.
Compressors
Compressor shipping brackets are removed.
Crankcase heaters must be energized for a minimum of
twelve (12) hours before startup.
IG Furnace