NOTE:
There must be a 2-inch (51 mm) space between the end of the condensate drain and the final termination point
(ground, open drain, etc.) to ensure that the line will drain freely.
After system installation is complete, the condensate drain line must be checked for leaks and the condensate
pumps must be checked to ensure proper operation. This check is part of the commissioning sequence. Pour
water into the evaporator drain pan to ensure proper condensate drainage. See figure right. If a leak is found,
shut down power to the unit at once and do not restore power to the unit until the problem has been resolved.
Drain Plug
Drain Pan
Cassette Base
Pour water
here for test
Cap
(Remove for test)
Figure 56. Condensate Drain Test
Cassette
Unit
7-7/8in.
2~3-15/16 in.
Drain
(slope of at least ¼ inch per foot)
Max.
28"
3 ft. (1 m)
SUPPORT
STRAPS
Figure 57. Indoor Unit Condensate Drain
Содержание MWMA009S4-*L
Страница 105: ...105 Error Code E2 continued Check point button press 1 time to check how many indoor units are connected ...
Страница 110: ...110 Error Code E5 continued IPM for 4 zone P N for 2 zone and 3 zone IPM for 2 zone and 3 zone ...
Страница 111: ...111 Error Code E5 continued P N for 4 zone Bridge rectifier for 2 zone and 3 zone Bridge rectifier for 4 zone ...
Страница 113: ...113 Error Code E6 continued Two terminals of the inductor Inductor ...
Страница 118: ...118 Error Code P1 continued ...
Страница 120: ...120 Error Code P2 continued ...
Страница 122: ...122 Error Code P3 continued ...
Страница 144: ...144 Error Code P0 continued P U P V ...
Страница 145: ...145 P W P N ...
Страница 151: ...151 Error Code P6 continued ...