
77
Figure 48. MWMA and MWMB Main Control Image
S1+S2
CCM Address
Figure 49. MWMA and MWMB Receiver Control Image (No Operation Switches on Main Control)
14. Condensate Pipe Work Installation
14.1. Outdoor Unit Condensate Piping
Condensate formed during the heating and defrost processes must be drained from heat pump units. Drain holes are
provided in the base of the units to ensure proper drainage. Heat pumps must be raised when installed on a concrete pad or
the ground to allow drainage to occur. If the heat pump unit is installed on wall mounting brackets, insert the provided drain
connector into one of the 1 inch (25 mm) drain holes and attached a field-provided insulated drain hose to the connector.
Use field-provided rubber plugs to cover any unused drain holes.
Содержание MWMA009S4-*L
Страница 105: ...105 Error Code E2 continued Check point button press 1 time to check how many indoor units are connected ...
Страница 110: ...110 Error Code E5 continued IPM for 4 zone P N for 2 zone and 3 zone IPM for 2 zone and 3 zone ...
Страница 111: ...111 Error Code E5 continued P N for 4 zone Bridge rectifier for 2 zone and 3 zone Bridge rectifier for 4 zone ...
Страница 113: ...113 Error Code E6 continued Two terminals of the inductor Inductor ...
Страница 118: ...118 Error Code P1 continued ...
Страница 120: ...120 Error Code P2 continued ...
Страница 122: ...122 Error Code P3 continued ...
Страница 144: ...144 Error Code P0 continued P U P V ...
Страница 145: ...145 P W P N ...
Страница 151: ...151 Error Code P6 continued ...