
82
Operating Manual
General Operating Instructions
OMBG3000 – Iss.01
© Copyright 2016
percentage complete is shown and remains on screen until the self-test is
completed.
Screen 2 - System Self-Test
During this time, many of the system’s functions are tested, including:
Testing of the CH4, CO2, O2, reference, barometer, internal cell,
external cell, and transducers is performed continuously over a short
period to check for faults and instability
The pump is switched on and the system checked for blockages
The next service due date is checked
Valid communications to the Interface PCB is checked
Test whether the ‘first time run set-up’ is required.
If no faults are found, then the first time set-up or monitoring will begin.
Note: After completion, if any non-critical failures occur then
Self-test finished with warnings
Note: If the fault is ‘service overdue’ or a channel warning (non-critical)
then the user can continue to the next stage by pressing the right soft key
‘Continue’. The BIOGAS 3000 will continue automatically after thirty
seconds if continue is not pressed.
Содержание BG3K2
Страница 1: ...OPERATING MANUAL...
Страница 2: ...OMBG3000 Iss A Copyright 2016...
Страница 28: ...28 Operating Manual BIOGAS 3000 Overview OMBG3000 Iss 01 Copyright 2016...
Страница 51: ...Operating Manual Installation 51 Copyright 2016 OMBG3000 Rev1...