
Operating Manual
153
© Copyright 2016
OMBG3000 – Rev1
Note: Ensure the drain valve is closed when performing the pressure test.
Note: An additional two ball valves will be required if not installed on the
‘Process Return’ and ‘Vent to Atmosphere’ outlets as recommended
during the installation.
7.6.4.1
BG3K1 and BG3KE without an External Sensor
Apply
pressure to:
Solenoid
1
Solenoid
6
Air Purge
OFF
OFF
Sample Gas 1
ON
ON
Note: Ensure the ball valves on the ‘Process Return’ and ‘Vent to
Atmosphere’ lines are opened once testing is completed.
Note: When reattaching the sample pipes to the system, ensure all tube
connections are tight and free from leaks.
Note: If assistance is required, please contact our technical support team
at (800) 968-2026 or email
Содержание BG3K2
Страница 1: ...OPERATING MANUAL...
Страница 2: ...OMBG3000 Iss A Copyright 2016...
Страница 28: ...28 Operating Manual BIOGAS 3000 Overview OMBG3000 Iss 01 Copyright 2016...
Страница 51: ...Operating Manual Installation 51 Copyright 2016 OMBG3000 Rev1...