
Operating Manual
157
© Copyright 2016
OMBG3000 – Rev1
7.6.4.5
BG3KD
Apply
pressure to:
Solenoid
1
Solenoid
2
Solenoid
3
Solenoid
4
Solenoid
5
Solenoid
6
Air Purge
OFF
OFF
OFF
OFF
ON
OFF
Sample Gas 1
OFF
OFF
OFF
OFF
OFF
OFF
Sample Gas 2
OFF
OFF
ON
ON
OFF
ON
Note: Ensure the ball valves on the ‘Process Return’ and ‘Vent to
Atmosphere’ lines are opened once testing is completed.
Note: When reattaching the sample pipes to the system, ensure all tube
connections are tight and free from leaks.
Note: If assistance is required, please contact our technical support team
at (800) 968-2026 or email
7.6.4.6
BG3KE with an External Sensor
Apply
pressure to:
Solenoid
1
Solenoid
3
Solenoid
4
Solenoid
6
Air Purge
OFF
OFF
OFF
OFF
Sample Gas 1
ON
OFF
ON
OFF
Note: Ensure the ball valves on the ‘Process Return’ and ‘Vent to
Atmosphere’ lines are opened once testing is completed.
Note: When reattaching the sample pipes to the system, ensure all tube
connections are tight and free from leaks.
Содержание BG3K2
Страница 1: ...OPERATING MANUAL...
Страница 2: ...OMBG3000 Iss A Copyright 2016...
Страница 28: ...28 Operating Manual BIOGAS 3000 Overview OMBG3000 Iss 01 Copyright 2016...
Страница 51: ...Operating Manual Installation 51 Copyright 2016 OMBG3000 Rev1...