
162
Operating Manual
OMBG3000 – Iss.01
© Copyright 2016
port on the module.
Warning
It is critical that the connections are fully secured to
ensure that no gas leaks in to the main enclosure. It is
recommended that a
ensure the system is leak free.
9
Power on the module by pressing
the on/off key for two seconds.
10
The hot swap module will pre-
load the configuration from the
Interface PCB and run the
operator through a
Note: After replacing the BIOGAS 3000 module, LANDTEC recommends
that a gas check be performed on the system to ensure it is still reading
accurately. If required, a user calibration can also be performed; refer to
the
section of this operating manual for more
information.
Содержание BG3K2
Страница 1: ...OPERATING MANUAL...
Страница 2: ...OMBG3000 Iss A Copyright 2016...
Страница 28: ...28 Operating Manual BIOGAS 3000 Overview OMBG3000 Iss 01 Copyright 2016...
Страница 51: ...Operating Manual Installation 51 Copyright 2016 OMBG3000 Rev1...