
142
Operating Manual
OMBG3000 – Iss.01
© Copyright 2016
6
Reconnect the system tubing by
connecting the QRC to the top of
the catchpot.
Note: Ensure that the
coupling ‘clicks’ in to place.
Warning
It is critical that the connections are fully secured to
ensure that no gas leaks in to the main enclosure.
7
Open the gas inlet and gas outlet
valves.
8
From the sampling stopped
screen, press the left soft key to
‘Restart’ the monitoring process
and return to the ‘Gas Readings
Screen’.
Warning
Once all maintenance is completed, it is recommended
that a
the system is leak free.
Содержание BG3K2
Страница 1: ...OPERATING MANUAL...
Страница 2: ...OMBG3000 Iss A Copyright 2016...
Страница 28: ...28 Operating Manual BIOGAS 3000 Overview OMBG3000 Iss 01 Copyright 2016...
Страница 51: ...Operating Manual Installation 51 Copyright 2016 OMBG3000 Rev1...