2NP
1-2-47
Enabling IC Card Authentication
Precautions
To install the optional function, you need the License Key. Please access the designated website of your
dealer or service representative, and register “Machine No.” indicated on your machine and “Product ID” indi-
cated on the License Certificate supplied with the product to issue the License Key.
1. Turn the main power switch on.
2. Press the System Menu key and then press [System/Network].
If user login administration is disabled, the user authentication screen appears.
Enter your login user name and password and then press [Login]. For this, you need to log in with admin-
istrator privileges.
3. Press [Next] of Optional Function.
4. Select CARD AUTHENTICATION KIT(B) and press [Activate].
5. The License Key entry screen is displayed.
Enter the License Key using the numeric keys and press [Official].
6. Confirm the product name CARD AUTHENTICATION KIT(B) and press [Yes].
7. To use a SSFC card, run maintenance mode U222 and set SSFC.
*: When the machine has entered sleep mode with Energy Saver ON, IC cards can not be recognized by
the Card reader, since it does not wake from sleep mode. To enable the IC Card Reader in Sleep Mode,
refer to the Operation Guide to change the Sleep level to OFF in the Sleep Rules at the Date/Timer/
Energy Saver section of the System Menu.
*: This setting is not necessary when the optional network interface kit is installed.
Содержание TASKalfa 2551ci
Страница 1: ...SERVICE MANUAL Published in September 2016 842NP11A 2NPSM06A Rev A TASKalfa 2551ci ...
Страница 10: ...This page is intentionally left blank ...
Страница 97: ...2NP 1 1 2 74 This page is intentionally left blank ...
Страница 259: ...2NP 1 3 162 U486 Details on the modes Figure 1 3 47 Item No Description ...
Страница 473: ...2NP 1 5 62 This page is intentionally left blank ...
Страница 496: ...2NP 2 1 21 Figure 2 1 25 Duplex conveying section block diagram EPWB DU_SW DU_CL_REM YC25 3 YC24 3 DUCL DUS ...
Страница 497: ...2NP 2 1 22 This page is intentionally left blank ...
Страница 544: ...2NP 2 3 37 2 3 5 IH PWB Figure 2 3 5 IH PWB silk screen diagram YC1 1 2 YC8 1 3 YC6 2 1 YC4 6 1 YC3 YC10 YC9 ...
Страница 555: ...2NP 2 3 48 This page is intentionally left blank ...
Страница 584: ...Installation Guide DP 770 B Document processor DP 772 Document processor Installation Guide ...
Страница 620: ...DP 773 Document processor Installation Guide ...
Страница 646: ...PF 791 500 x 2 Paper feeder Installation Guide ...
Страница 654: ...PF 810 3000 sheets deck Installation Guide ...
Страница 667: ...DF 770 D Document finisher Installation Guide ...
Страница 685: ...AK 740 Bridge unit Installation Guide ...
Страница 687: ...PH 7A C D Punch unit Installation Guide ...
Страница 708: ...DT 730 B Document tray Installation Guide ...
Страница 710: ...5 2013 5 302LC56750 01 H F G D D 6 4 3 7 E C D D M4 8 M4 8 M4 8 M4 8 ...
Страница 711: ...FAX System W B Installation Guide ...