5
B
11
A
12
A
5.
Install the punch guide (A) so that the leading edge of the guide (11) is below the document fin-
isher frame (12).
6.
Insert the hole punch unit (B) into the docu-
ment finisher.
5.
Monter le guide de la perforatrice (A) de sorte que le bord d'attaque du guide (11) se trouve sous
le bâti du retoucheur de document (12).
6.
Insérer la perforatrice (B) dans le retoucheur
de document.
5.
Instale la guía de perforación (A) de forma tal que el borde delantero de la guía (11) quede
debajo de la carcasa del finalizador de documentos (12).
6.
Inserte la perforadora (B) en el finalizador de
documentos.
5.
Die Locherführung (A) so einsetzen, dass die Vorderkante der Führung (11) unter dem Rahmen
(12) des Dokument-Finishers liegt.
6.
Die Lochereinheit (B) in den Dokument-Fin-
isher einsetzen.
5.
Installare la guida perforazione (A) in modo che il bordo principale della guida (11) sia sotto il
telaio (12) della finitrice di documenti.
6.
Inserire l'unità di perforazione (B) nella fini-
trice di documenti.
5.
パンチガイド (A) の先端 (11) がドキュメントフィニッシャーのフレーム (12) の下になるよう
に取り付ける。
6.
パンチユニット (B) をドキュメントフィ
ニッシャーに挿入する。
5.
将打孔导向板 (A) 的前端 (11) 安装在装订器的框架 (12) 的下部。
6.
将打孔单元 (B) 插入到装订器中。
5.
펀치가이드 (A) 의 끝 (11) 이 문서 피니셔의 프레임 (12) 밑으로 되도록 장착합니다 .
6.
펀치유니트 (B) 를 문서 피니셔에 삽입합니
다 .
Содержание TASKalfa 2551ci
Страница 1: ...SERVICE MANUAL Published in September 2016 842NP11A 2NPSM06A Rev A TASKalfa 2551ci ...
Страница 10: ...This page is intentionally left blank ...
Страница 97: ...2NP 1 1 2 74 This page is intentionally left blank ...
Страница 259: ...2NP 1 3 162 U486 Details on the modes Figure 1 3 47 Item No Description ...
Страница 473: ...2NP 1 5 62 This page is intentionally left blank ...
Страница 496: ...2NP 2 1 21 Figure 2 1 25 Duplex conveying section block diagram EPWB DU_SW DU_CL_REM YC25 3 YC24 3 DUCL DUS ...
Страница 497: ...2NP 2 1 22 This page is intentionally left blank ...
Страница 544: ...2NP 2 3 37 2 3 5 IH PWB Figure 2 3 5 IH PWB silk screen diagram YC1 1 2 YC8 1 3 YC6 2 1 YC4 6 1 YC3 YC10 YC9 ...
Страница 555: ...2NP 2 3 48 This page is intentionally left blank ...
Страница 584: ...Installation Guide DP 770 B Document processor DP 772 Document processor Installation Guide ...
Страница 620: ...DP 773 Document processor Installation Guide ...
Страница 646: ...PF 791 500 x 2 Paper feeder Installation Guide ...
Страница 654: ...PF 810 3000 sheets deck Installation Guide ...
Страница 667: ...DF 770 D Document finisher Installation Guide ...
Страница 685: ...AK 740 Bridge unit Installation Guide ...
Страница 687: ...PH 7A C D Punch unit Installation Guide ...
Страница 708: ...DT 730 B Document tray Installation Guide ...
Страница 710: ...5 2013 5 302LC56750 01 H F G D D 6 4 3 7 E C D D M4 8 M4 8 M4 8 M4 8 ...
Страница 711: ...FAX System W B Installation Guide ...