2NP
1-5-56
10. Remove all connectors and FFC from
the operatioon panel PWB main.
11. Remove six screws and remove the
operation panel PWB main.
12. Check or replace the operation panel
PWB main and refit all the removed
parts.
Figure 1-5-102
Screw
Screw
Screw
Screw
Screw
Screw
Operation panel
PWB main
Operation papnel
upper unit
Содержание TASKalfa 2551ci
Страница 1: ...SERVICE MANUAL Published in September 2016 842NP11A 2NPSM06A Rev A TASKalfa 2551ci ...
Страница 10: ...This page is intentionally left blank ...
Страница 97: ...2NP 1 1 2 74 This page is intentionally left blank ...
Страница 259: ...2NP 1 3 162 U486 Details on the modes Figure 1 3 47 Item No Description ...
Страница 473: ...2NP 1 5 62 This page is intentionally left blank ...
Страница 496: ...2NP 2 1 21 Figure 2 1 25 Duplex conveying section block diagram EPWB DU_SW DU_CL_REM YC25 3 YC24 3 DUCL DUS ...
Страница 497: ...2NP 2 1 22 This page is intentionally left blank ...
Страница 544: ...2NP 2 3 37 2 3 5 IH PWB Figure 2 3 5 IH PWB silk screen diagram YC1 1 2 YC8 1 3 YC6 2 1 YC4 6 1 YC3 YC10 YC9 ...
Страница 555: ...2NP 2 3 48 This page is intentionally left blank ...
Страница 584: ...Installation Guide DP 770 B Document processor DP 772 Document processor Installation Guide ...
Страница 620: ...DP 773 Document processor Installation Guide ...
Страница 646: ...PF 791 500 x 2 Paper feeder Installation Guide ...
Страница 654: ...PF 810 3000 sheets deck Installation Guide ...
Страница 667: ...DF 770 D Document finisher Installation Guide ...
Страница 685: ...AK 740 Bridge unit Installation Guide ...
Страница 687: ...PH 7A C D Punch unit Installation Guide ...
Страница 708: ...DT 730 B Document tray Installation Guide ...
Страница 710: ...5 2013 5 302LC56750 01 H F G D D 6 4 3 7 E C D D M4 8 M4 8 M4 8 M4 8 ...
Страница 711: ...FAX System W B Installation Guide ...