2NP-4
1-3-206
U952
Method: [Execute(USB)]
1. Press the power key on the operation panel, and after verifying the main power indicator has
gone off, switch off the main power switch.
2. Insert USB memory in USB memory slot.
3. Turn the main power switch on.
4. Enter maintenance item U952.
5. Select [Execute(USB)].
6. Select the workflow.
7. Press the start key.
Executes maintenance modes defined in a workflow in succession.
Method: [Entry(USB)]
1. Press the power key on the operation panel, and after verifying the main power indicator has
gone off, switch off the main power switch.
2. Insert USB memory in USB memory slot.
3. Turn the main power switch on.
4. Enter maintenance item U952.
5. Select [Entry(USB)].
6. Select the workflow.
7. Select the work flow save area.
8. Select [Execute].
Exports a workflow housed in a USB flash device to the machine.
Example
Registration is feasible when a USB flash device that stores the commands and text/mainte-
nance ID (editable) is inserted.
File Format: xxx.mwf
1.SET UP, 464, 469, 410, 000, 927, 278
2.WARRANTY, 089, 000
3.MK-A, 127, 901, 410, 251
4.MK-B, 410, 251
5.EH SET UP, 411, 034, 246
Completion
Press the stop key. The screen for selecting a maintenance item No. is displayed.
Item No.
Description
Display
Description
WorkFlowData01 - 07
Workflow data in the USB flash device
Display
Description
WorkFlowData01 - 07
Workflow data in the USB flash device
Display
Description
Data1 - 8
The area to store workflows in the machine
USB
USB memory
Содержание TASKalfa 2551ci
Страница 1: ...SERVICE MANUAL Published in September 2016 842NP11A 2NPSM06A Rev A TASKalfa 2551ci ...
Страница 10: ...This page is intentionally left blank ...
Страница 97: ...2NP 1 1 2 74 This page is intentionally left blank ...
Страница 259: ...2NP 1 3 162 U486 Details on the modes Figure 1 3 47 Item No Description ...
Страница 473: ...2NP 1 5 62 This page is intentionally left blank ...
Страница 496: ...2NP 2 1 21 Figure 2 1 25 Duplex conveying section block diagram EPWB DU_SW DU_CL_REM YC25 3 YC24 3 DUCL DUS ...
Страница 497: ...2NP 2 1 22 This page is intentionally left blank ...
Страница 544: ...2NP 2 3 37 2 3 5 IH PWB Figure 2 3 5 IH PWB silk screen diagram YC1 1 2 YC8 1 3 YC6 2 1 YC4 6 1 YC3 YC10 YC9 ...
Страница 555: ...2NP 2 3 48 This page is intentionally left blank ...
Страница 584: ...Installation Guide DP 770 B Document processor DP 772 Document processor Installation Guide ...
Страница 620: ...DP 773 Document processor Installation Guide ...
Страница 646: ...PF 791 500 x 2 Paper feeder Installation Guide ...
Страница 654: ...PF 810 3000 sheets deck Installation Guide ...
Страница 667: ...DF 770 D Document finisher Installation Guide ...
Страница 685: ...AK 740 Bridge unit Installation Guide ...
Страница 687: ...PH 7A C D Punch unit Installation Guide ...
Страница 708: ...DT 730 B Document tray Installation Guide ...
Страница 710: ...5 2013 5 302LC56750 01 H F G D D 6 4 3 7 E C D D M4 8 M4 8 M4 8 M4 8 ...
Страница 711: ...FAX System W B Installation Guide ...