2NP-3
1-2-1
1-2 Installation
1-2-1 Installation environment
1. Temperature: 10 to 32.5°C/50 to 90.5°F
2. Humidity: 15 to 80% RH
3. Power supply: 120 V AC, 12.0 A
220 - 240 V AC, 7.2A
4. Power supply frequency: 50 Hz ±2%/60 Hz ±2%
5. Installation location
Avoid direct sunlight or bright lighting. Ensure that the photoconductor will not be exposed to direct sun-
light or other strong light when removing paper jams.
Avoid locations subject to high temperature and high humidity or low temperature and low humidity; an
abrupt change in the environmental temperature; and cool or hot, direct air.
Avoid places subject to dust and vibrations.
Choose a surface capable of supporting the weight of the machine.
Place the machine on a level surface.
The degree of level: 5 mm or less of front and rear, right and left
Twist: 3 mm or less
Avoid air-borne substances that may adversely affect the machine or degrade the photoconductor, such
as mercury, acidic of alkaline vapors, inorganic gasses, NOx, SOx gases and chlorine-based organic sol-
vents.
Select a well-ventilated location.
6. Allow sufficient access for proper operation and maintenance of the machine.
Figure 1-2-1
100 mm
3 15/16”
450 mm
17 11/16”
1000 mm
39 3/8”
100 mm
3 15/16”
500 mm
19 11/16”
Содержание TASKalfa 2551ci
Страница 1: ...SERVICE MANUAL Published in September 2016 842NP11A 2NPSM06A Rev A TASKalfa 2551ci ...
Страница 10: ...This page is intentionally left blank ...
Страница 97: ...2NP 1 1 2 74 This page is intentionally left blank ...
Страница 259: ...2NP 1 3 162 U486 Details on the modes Figure 1 3 47 Item No Description ...
Страница 473: ...2NP 1 5 62 This page is intentionally left blank ...
Страница 496: ...2NP 2 1 21 Figure 2 1 25 Duplex conveying section block diagram EPWB DU_SW DU_CL_REM YC25 3 YC24 3 DUCL DUS ...
Страница 497: ...2NP 2 1 22 This page is intentionally left blank ...
Страница 544: ...2NP 2 3 37 2 3 5 IH PWB Figure 2 3 5 IH PWB silk screen diagram YC1 1 2 YC8 1 3 YC6 2 1 YC4 6 1 YC3 YC10 YC9 ...
Страница 555: ...2NP 2 3 48 This page is intentionally left blank ...
Страница 584: ...Installation Guide DP 770 B Document processor DP 772 Document processor Installation Guide ...
Страница 620: ...DP 773 Document processor Installation Guide ...
Страница 646: ...PF 791 500 x 2 Paper feeder Installation Guide ...
Страница 654: ...PF 810 3000 sheets deck Installation Guide ...
Страница 667: ...DF 770 D Document finisher Installation Guide ...
Страница 685: ...AK 740 Bridge unit Installation Guide ...
Страница 687: ...PH 7A C D Punch unit Installation Guide ...
Страница 708: ...DT 730 B Document tray Installation Guide ...
Страница 710: ...5 2013 5 302LC56750 01 H F G D D 6 4 3 7 E C D D M4 8 M4 8 M4 8 M4 8 ...
Страница 711: ...FAX System W B Installation Guide ...