Chapter 5 Disassembly and Assembly
5-20
5.3.2 Changing the Mounting Location of the Operation Unit
This section describes the instructions on how to change the mounting location of the operation unit.
Following are the procedures taking example for the case that the horizontal positioning will be changed
to the vertical positioning, though the same procedures can be used for the unit with the vertical
positioning.
Work outline
Listed below are the number of people and the rough standard of work hours required for performing the
works described in this section.
Requirements
The works in this section can be performed using only the standard tools.
Attachment Position of the Operation Panel
1
Removal Procedures (Page 5-6)"
"5.2.3 Removing/Installing the Exterior Panel and
to remove the insertion unit.
Reverse the removed insertion unit and place it in a stable place in order to perform the replacing work.
2
Remove the dummy operation panel.
•
4 tapping screws (M4 x 10)
3
Unplug the cable to the operation unit at the
clamps.
•
Clamps for 2 locations
Caution
Be sure to turn off the power supply circuit breaker and unplug the power cable from the
equipment whenever you disassemble/assemble the equipment.
Personnel
Number
Work Hours (steps 2 to 7)
1
Horizontal Positioning (Factory Default)
Operation
Unit
Vertical Positioning
Содержание 0902
Страница 2: ......
Страница 6: ......
Страница 12: ......
Страница 30: ...2 10...
Страница 54: ......
Страница 84: ...Chapter 3 Troubleshooting 3 30 3 2 19 Confirm the H sync Signal To be stated...
Страница 85: ...Chapter 3 Troubleshooting 3 31 3 2 20 Confirm the LMC Operation To be stated...
Страница 120: ......
Страница 296: ...8 10...
Страница 300: ......
Страница 301: ......