Chapter 5 Disassembly and Assembly
5-76
8
Remove the cable bear unit assembly from the
holding plate.
•
1 screw (M3 x 6)
9
Remove the cable bear unit assembly from the
subscan base.
•
1 screw (M3 x 6)
10
Remove the tap plate and the tap plate B from the
cable bear tie.
•
Tap plate (subscan base mount side)
•
1 screw (M3 x 6)
•
Snap tie (remove it)
•
Grounding cable: 1 hex/Phillips-head screw
(M4 x 8)
•
Tap plate B (holding plate mount side)
•
1 screw (M3 x 6)
11
Install the tap plate and the tap plate B on the
new cable bear tie.
•
Tap plate (subscan base mount side)
•
1 screw (M3 x 6)
•
Snap tie (remove it)
•
Grounding cable: 1 hex/Phillips-head screw
(M4 x 8)
•
Tap plate B (holding plate mount side)
•
1 screw (M3 x 6)
When installing the grounding cable, incline it as shown
in the figure.
12
Fix the cables excluding a serial cable using the
snap ties.
13
See
to install the cable bear unit assembly
on the subscan base.
•
1 screw (M3 x 6)
14
Wire the serial cable (connector: CCN11) and fix
it using the wiring band.
Position the white mark on the cable to the position A in
the figure. In addition, when fixing, make sure that the
cable is located outside at the positions A, B, D and E.
First Front Side
Tie
Grounding Cable
A
B
C
E
D
Second Front Back Side
Содержание 0902
Страница 2: ......
Страница 6: ......
Страница 12: ......
Страница 30: ...2 10...
Страница 54: ......
Страница 84: ...Chapter 3 Troubleshooting 3 30 3 2 19 Confirm the H sync Signal To be stated...
Страница 85: ...Chapter 3 Troubleshooting 3 31 3 2 20 Confirm the LMC Operation To be stated...
Страница 120: ......
Страница 296: ...8 10...
Страница 300: ......
Страница 301: ......