Chapter 5 Disassembly and Assembly
5-62
5.4.13 Replacing the Justifier Belt
This section describes the instructions on how to replace the justifier belt.
Work outline
Listed below are the number of people and the rough standard of work hours required for performing the
works described in this section.
Requirements
Shown below are the tools requiring to be prepared in addition to the standard tools before performing the
works in this section.
1
Removal Procedures (Page 5-6)"
"5.2.3 Removing/Installing the Exterior Panel and
to remove the exterior panel and insertion unit.
2
Remove the exterior frame (front).
•
4 screws (M4 x 8)
Loosen all screws.
3
Move the justifier guide to the center of the shaft.
4
Remove the setscrews of the justifier base
(justifier guide unit assembly).
•
2 screws (M4 x 8)
Caution
Be sure to turn off the power supply circuit breaker and unplug the power cable from the
equipment whenever you disassemble/assemble the equipment.
Personnel
Number
Work Hours (steps 2 to 16)
1
No.
Tool
No.
Tool
1
Acoustic wave tension meter
2
Grease (Plusguard No. 2 by Kyodo Yushi)
3
Waste cloth (used for greasing)
First Front Side
First Front Side
Содержание 0902
Страница 2: ......
Страница 6: ......
Страница 12: ......
Страница 30: ...2 10...
Страница 54: ......
Страница 84: ...Chapter 3 Troubleshooting 3 30 3 2 19 Confirm the H sync Signal To be stated...
Страница 85: ...Chapter 3 Troubleshooting 3 31 3 2 20 Confirm the LMC Operation To be stated...
Страница 120: ......
Страница 296: ...8 10...
Страница 300: ......
Страница 301: ......