2) Set the lock lever to FREE position (F).
Be sure to operate the lock lever by the operating por-
tion on the top.
3) Operate the work equipment control lever to swing the
upper structure so that the work equipment is on the
sprocket side (A).
At this time, set the undercarriage and upper structure
in parallel.
4) Pull the blade control lever toward you to raise the
blade fully.
5) If the boom is swung to either right or left, operate the boom swing control pedal to swing the boom so
that it comes parallel to the undercarriage.
After controlling the boom swing control pedal, set the swing lock cover to LOCK position.
6) Operate the work equipment control levers, and extend the bucket cylinder, arm cylinder, and boom
cylinder to their stroke end.
7) Set the lock lever to LOCK position (L).
Be sure to operate the lock lever by the operating por-
tion on the top.
8) Stop the engine.
2.
Check that there is nothing around the operator's seat, and
then get off the machine.
When the machine is equipped with cab, close the cab
door and front window, etc. securely.
3.
Install shackles to the holes (2 places) for lifting at both
ends of blade, and set the wire ropes.
OPERATION
TRANSPORTATION
3-227
Содержание PC45MR-30403
Страница 61: ......
Страница 62: ...OPERATION Please read and make sure that you understand the SAFETY section before reading this section 3 1...
Страница 64: ...14 Engine rear cover 15 Cooling cover 16 Battery 17 KDPF OPERATION GENERAL VIEW 3 3...
Страница 310: ...MAINTENANCE Please read and make sure that you understand the SAFETY section before reading this section 4 1...
Страница 411: ......
Страница 412: ...SPECIFICATIONS 5 1...
Страница 417: ......
Страница 459: ......
Страница 460: ...REPLACEMENT PARTS 7 1...
Страница 475: ...PC45MR 5 PC55MR 5 HYDRAULIC EXCAVATOR Form No TEN00763 04 2018 KOMATSU All Rights Reserved Printed in Japan 02 2018...