1) Set the machine in the posture shown in the figure.
1]
Start the engine.
2]
Set the lock lever to FREE position.
Be sure to operate the lock lever by the operating
portion on the top.
3]
Operate the work equipment control lever slowly
to the right and left to swing the upper structure
so that the fuel prefilter comes between the
tracks.
4]
Operate the work equipment control levers, and
lower the work equipment to the ground.
5]
Set the lock lever to LOCK position.
Be sure to operate the lock lever by the operating portion on the top.
6]
Stop the engine.
2) Place a container under the fuel prefilter to catch the fuel.
3) Turn the handle (7) to CLOSE position (S), and loosen
the drain plug (8).
4) Drain the water until the red ring (5) contacts to the
bottom of transparent cup (6).
5) Tighten the drain plug (8), and turn the handle (7) to
OPEN position (O).
5.
Turn the rod (4) to FREE position (F), and close the cooling cover (3).
6.
Close the engine rear cover (1).
OPERATION
MACHINE OPERATIONS AND CONTROLS
3-137
Содержание PC45MR-30403
Страница 61: ......
Страница 62: ...OPERATION Please read and make sure that you understand the SAFETY section before reading this section 3 1...
Страница 64: ...14 Engine rear cover 15 Cooling cover 16 Battery 17 KDPF OPERATION GENERAL VIEW 3 3...
Страница 310: ...MAINTENANCE Please read and make sure that you understand the SAFETY section before reading this section 4 1...
Страница 411: ......
Страница 412: ...SPECIFICATIONS 5 1...
Страница 417: ......
Страница 459: ......
Страница 460: ...REPLACEMENT PARTS 7 1...
Страница 475: ...PC45MR 5 PC55MR 5 HYDRAULIC EXCAVATOR Form No TEN00763 04 2018 KOMATSU All Rights Reserved Printed in Japan 02 2018...