![Kirby Morgan SuperLite 27 Скачать руководство пользователя страница 98](http://html.mh-extra.com/html/kirby-morgan/superlite-27/superlite-27_operation-and-maintenance-manual_1971913098.webp)
82
© ⅯⅯⅩⅢ Kirby Morgan Dive Systems, Inc. All rights reserved. Document # 130115001
SuperLite
®
27
®
separated from the metal disc. Hold the diaphragm
to a bright white light, while aggressively pulling and
stretching to reveal damage, deterioration, or holes.
Diaphragms showing any indication of damage must
be replaced. The diaphragm should always be replaced
during scheduled annual overhauls.
6) Inspect the whisker. Replace the whisker if it
shows signs of wear, aging or any damage. See "7.10
Tri-Valve
®
Exhaust Assembly" on page 93 for the
Tri-Valve
®
Exhaust System.
7.8.8 Reassembly of the SuperFlow
®
350
Demand Regulator
NOTE: Use the blow-apart in the back of the
manual to help ensure correct assembly.
1) Install the exhaust flange, gasket, and screws onto
the regulator body. Use Loctite
®
222 to secure the
Align the flange and the gasket.
Apply a drop of threadlocker to the screws.
Install and tighten the two screws that hold the
flange in position.
WARNING
The gasket that sits between the regulator
exhaust flange and regulator body must
be in place. Without this flange, the regu-
lator will leak and drowning could result.
Install the exhaust valve in the regulator body.
screws. Tighten the screws to 6 inch pounds.
2) Trim off any excess material from the gasket that
might interfere with the operation of the exhaust valve.
3) Install the new exhaust valve into the regulator and
trim off any excess stem that may interfere with the
movement of the lever or inlet valve.
4) While using the castle wrench to hold the inlet
valve, insert the valve into the bent tube end of the