P/N 960-100190RA_Rev. A {EDP #148851}
© 2009, Japan CashMachine Co., Limited
2 - 1 3
Installation/Operation
VEGA-RC™ BankNote Recycler Section
2
Operational Flowcharts (Continued 4)
Figure 2-35 depicts part five of a typical VEGA-RC Banknote acceptance flow process (Dispense).
Figure 2-36 depicts part six of a typical VEGA-RC Banknote acceptance flow process (Clear Jam).
a) Start Dispense
b) Dispense Completed?
c) Decrement 1 Count Down on Display
B2) Dispense Flow
A) To Stand-By (See Figure 2-31 on
page 2-10)
d) Has a JAM Occurred?
E) To Clear JAM Flow Process (See
Figure 2-36 on page 2-13)
Figure 2-35
VEGA-RC Banknote Recycler Operational Flowchart (Dispense Mode)
E) Begin Clearing a JAM
a) Error Notification to VEGA Unit
F) Stop
Figure 2-36
VEGA-RC Banknote Recycler Operational Flowchart (Clear JAM Mode)