P/N 960-100190RA_Rev. A {EDP #148851}
© 2009, Japan CashMachine Co., Limited
2 - 1
S e c t i o n 2
This section provides installation and operation
instructions for the VEGA Series BankNote
Recycler. The information within contains the
following features:
•
Installation
•
DIP Switch Configurations
•
Connector Pin Assignments
•
Cleaning/Preventive Maintenance
•
Interface Schematic
•
Operational Flowchart.
Installation
Installation Procedure
Perform the following steps to install an optional
VEGA-RC Unit onto a VEGA Unit body:
1. Place the VEGA RC into position on top of the
VEGA BV as shown in Figure 2-1. The four
circular guide posts on the bottom of the RC Unit
should fit directly into the four circular guide
hole receptacles located on the VEGA Unit.
2. Gently press the Unit down into the mating hole
receptacles, and listen for a click sound when the
two (2) Latches lock in place between the
VEGA-RC and the VEGA Unit body (See Figure
2-2 a).
3. Install
the
VEGA-RC
Harness Cable Connector
into its VEGA Unit mating Receptacle to signal
interconnect the Units (See Figure 2-2-b).
DIP Switch Configurations
Table 2-1 lists the DIP Switch settings for the
VEGA-RC following its physical mounting on,
and cabling to, the VEGA Unit.
2 INSTALLATION/OPERATION
Figure 2-1
VEGA-RC Positioning Post Locations
Table 2-1
DIP Switch Settings
Switch
No.
Switch ON
Switch OFF
1
Denomination Settings
(Communicated to VEGA)
Reserved
2
3
4
5
6
7
Reserved (OFF)
Reserved (OFF)
8
Enable self test
Disable self test
a
2
a
1
b
Figure 2-2
Latch Button and Harness Locations
a) Release Latch Button (One on each side)
b) Harness Connector