![J. D. NEUHAUS Profi 025Ti Скачать руководство пользователя страница 52](http://html1.mh-extra.com/html/j-d-neuhaus/profi-025ti/profi-025ti_operation-manual_3093639052.webp)
R E M O V I N G A N D I N S TA L L I N G L OA D S L E E V E
A N D B U F F E R
- SINGLE CHAIN HOIS T S (025 TI, 05 TI, 1 TI)
Removal
Drive out the roll pin
1
for securing the chain from
the load sleeve
3
.
Remove the chain link
2
from the chain pocket.
Detach the buffer
4
and buffer discs
5
from the
chain.
Assembly
Push the buffer discs (edge encloses buffer) and the
buffer onto the chain.
Insert the chain link into the chain pocket of the
load sleeve (position of the weld must align with
that of the following links).
Drive in a new roll pin to secure the chain link in the
load sleeve.
R E M OV I N G A N D I N S TA L L I N G B O T T O M B L O C K
A N D B U F F E R S
- D UA L C H A I N H O I S T (2 TI)
Removal
Move the bottom block as close as possible to the
hoist body.
Position the bottom block securely in order to
prevent the chain from unravelling uncontrollably
causing the bottom block to fall.
Remove the chain link
1
of the bottom block from
the chain mount on the hoist body; drive out the roll
pin
2
and the end chain link pin
3
for this purpose.
Draw the spacer pipe
4
from the chain.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
8
1
2
3
4
5
5
REMOVING AND INSTALLING LOAD SLEEVE,
BOTTOM BLOCK, CLAMP AND BUFFER
powered by air !
M A I N T E N A NC E
Page 52
Содержание Profi 025Ti
Страница 1: ...powered by air J D N O P E R A T I O N M A N U A L A I R H O I S T S...
Страница 65: ...powered by air NOTES Page 65...
Страница 66: ...powered by air NOTES Page 66...
Страница 67: ...powered by air NOTES Page 67...
Страница 217: ......