![J. D. NEUHAUS Profi 025Ti Скачать руководство пользователя страница 184](http://html1.mh-extra.com/html/j-d-neuhaus/profi-025ti/profi-025ti_operation-manual_3093639184.webp)
powered by air !
M A I N T E N A N C E
Page 42
Inspection measure
Interval
Comment
1
If available
For monorail hoists, also refer to ”Maintenance and inspection measures” in the
Trolley operation manual
.
Check sealing efficiency and function
of control valve
Check condition of the chain box
1
including mountings
Check for brake wear and motor
vane wear
In off-shore areas and other similar
corrosive environments, replace the
chainregularly
Check gearbox and perform lubricant
change
Check the rotor/pinion shaft connec-
tion and lubricate with gear grease
Check the chain sprocket bearings
and lubricate if necessary
Check chain sprocket and chain guides
Renew grease lubrication of motor
(
Chain box
section, page 63)
(Replacing brake disc, brake piston and vanes
section, page 48), replace motor vanes every 5 years
(
Wear dimensions
section, page 56)
(
Motor lubrication
section, page 48)
Annually
Annually
Every 200 hours, at least
every 5 years
Every 5 years
Every 5 years
Every 5 years
Every 5 years
Whenever chain is replaced
When required,
at least every 5 years
Содержание Profi 025Ti
Страница 1: ...powered by air J D N O P E R A T I O N M A N U A L A I R H O I S T S...
Страница 65: ...powered by air NOTES Page 65...
Страница 66: ...powered by air NOTES Page 66...
Страница 67: ...powered by air NOTES Page 67...
Страница 217: ......