Renewing motor lubrication:
Note:
The grease packing in the rotor chambers is
sufficient for approx. 250 hours of normal operation.
The rotor chambers are only emptied by approx. 75%.
In this condition, refilling must be performed.
The retaining rings
9
and Vyon washers
10
must be
removed in order to refill the chambers.
Then pack the chambers with high-performance lubri-
cant (JDN Art. no 11901) without forming cavities.
Use new Vyon washers to close off the lubricant cham-
bers and secure these using retaining rings.
Replace centre section halves with brake lining.
If the centre section half with brake lining is to be
replaced, the following removal operation is also
required.
Detach the hoist from the point of attachment and
set down carefully.
Detach the chain box if necessary.
Remove the control valve.
Unscrew centre section bolts
11
.
Detach the motor with centre section half on the
motor-side from the hoist.
Remove the bolts
12
and pull out the centre section
half with the brake lining
13
.
Motor installation with additional basic lubrication:
Apply high-performance grease lightly to braking
surface and rotor bearing (needle bush) in the
centre section half and slide this into the motor
housing. At the same time, insert the anti-twist
device (pin).
Bolt centre section half to motor housing.
Coat the internal cylinder of the motor housing
lightly with high-performance grease.
Coat the entire rotor lightly with high-performance
grease and insert into the front rotor bearing with
the clutch side first.
Coat the vanes lightly with high-performance grease
and insert into the rotor slots with the starting aids.
Coat the braking surface and the outer diameter
including the brake piston seal lightly with high-
performance grease and push the brake piston with
the braking surface first into the internal cylinder.
Note the position of the eccentric bore.
Insert the brake springs into the bores of the
brake piston.
Loosen adjusting bolts
14
and lock nuts
15
.
Screw back adjusting bolts.
Apply high-performance grease lightly to rotor bearing
(needle bush) in the motor cover and install motor
cover. Ensure correct seating of the brake springs and
the locating pins to the motor housing and to the
brake piston. Do not tighten the four adjusting bolts
after bolting the motor cover in place, only screw
them in loosely by hand to the stop in the cover.
Screw back the lock nuts sufficiently beforehand.
Then screw back the adjusting bolts 45° from the
stop, hold, and lock with the nuts. For lifting heights
of 10 m and more, a setting of up to 60° is required.
For operation in areas with ambient temperatures
exceeding 30° C, the adjustment has to be carried out
with the device warmed up accordingly.
Checking vane wear
Vane
Rotor
Cylinder liner
Brake piston
V2 max. = 0.2 mm
•
•
•
Brake disc
•
V1 max. = 0.2 mm
R
•
Lmax = R – (V1 + V2)
Lmin = R – (V1 + V2) – 0.3 mm = Lmax – 0.3 mm
L
L h
powered by air !
M A I N T E N A NC E
Page 50
Содержание Profi 025Ti
Страница 1: ...powered by air J D N O P E R A T I O N M A N U A L A I R H O I S T S...
Страница 65: ...powered by air NOTES Page 65...
Страница 66: ...powered by air NOTES Page 66...
Страница 67: ...powered by air NOTES Page 67...
Страница 217: ......