54
NEW STRALIS MY2016
‒
GUIDELINES FOR BODYBUILDERS
ELECTRONIC SUB-SYSTEMS
5.10
MISCELLANEOUS
–
Printed 692.68.697
–
5 Ed. - Base 03/2019
Pin
Description
Cable
code
Max.
Load
Connected to
Remarks
2
Key activated positive
connected to fuse for EBS
/ speed limiter
8847
10 A
75000-A8 / F8
3
Ground
0000
10 A
Ground
4
Ground
0000
30 A
Ground
5
Trailer EBS fault signal
6671
BCM E22
Inlet of the BCM control unit with dry current of the 10 mA contact.
6
CAN H line
WS/Bi
EBS X3-2
Connected to EBS control unit
7
CAN L line
GN/Ve
EBS X3-4
Connected to EBS control unit
e) Side marker light installation (Side Marker Lamps)
EC regulations require that vehicles are provided with side and clearance lights when the total length exceeds 6 m.
Installation of the side lights must be carried out on the additional structures (containers, vans, etc.), while the electric power supply
is obtained by the specific connectors ST77 and ST78 on the chassis (trucks only).
Below is an illustration of the position for these terminals.
Note
It is not possible to draw current from side marker lights.
Содержание Stralis MY 2016
Страница 1: ...I S S U E 0 3 2 0 1 9...
Страница 3: ...Printed 692 68 697 5 Ed Base 03 2019 UPDATE DATA Section Chapter Description Revision date...
Страница 6: ...Printed 692 68 697 5 Ed Base 03 2019...
Страница 7: ...Printed 692 68 697 5 Ed Base 03 2019 SECTION 1 GENERAL INFORMATION...
Страница 8: ...Printed 692 68 697 5 Ed Base 03 2019...
Страница 10: ...4 NEW STRALIS MY2016 GUIDELINES FOR BODYBUILDERS GENERAL INFORMATION Printed 692 68 697 5 Ed Base 03 2019...
Страница 26: ...20 NEW STRALIS MY2016 GUIDELINES FOR BODYBUILDERS GENERAL INFORMATION Printed 692 68 697 5 Ed Base 03 2019...
Страница 27: ...Printed 692 68 697 5 Ed Base 03 2019 SECTION 2 CHASSIS INTERVENTIONS...
Страница 28: ...Printed 692 68 697 5 Ed Base 03 2019...
Страница 86: ...60 NEW STRALIS MY2016 GUIDELINES FOR BODYBUILDERS CHASSIS INTERVENTIONS Printed 692 68 697 5 Ed Base 03 2019...
Страница 87: ...Printed 692 68 697 5 Ed Base 03 2019 SECTION 3 APPLICATIONS OF SUPERSTRUCTURES...
Страница 88: ...Printed 692 68 697 5 Ed Base 03 2019...
Страница 139: ...Printed 692 68 697 5 Ed Base 03 2019 SECTION 4 POWER TAKE OFFS...
Страница 140: ...Printed 692 68 697 5 Ed Base 03 2019...
Страница 142: ...4 NEW STRALIS MY2016 GUIDELINES FOR BODYBUILDERS POWER TAKE OFFS Printed 692 68 697 5 Ed Base 03 2019...
Страница 165: ...Printed 692 68 697 5 Ed Base 03 2019 SECTION 5 ELECTRONIC SUB SYSTEMS...
Страница 166: ...Printed 692 68 697 5 Ed Base 03 2019...
Страница 168: ...4 NEW STRALIS MY2016 GUIDELINES FOR BODYBUILDERS ELECTRONIC SUB SYSTEMS Printed 692 68 697 5 Ed Base 03 2019...
Страница 225: ...Printed 692 68 697 5 Ed Base 03 2019 SECTION 6 ADBLUE AND SCRT SYSTEM...
Страница 226: ...Printed 692 68 697 5 Ed Base 03 2019...
Страница 228: ...4 NEW STRALIS MY2016 GUIDELINES FOR BODYBUILDERS ADBLUE AND SCRT SYSTEM Printed 692 68 697 5 Ed Base 03 2019...
Страница 235: ...Printed 692 68 697 5 Ed Base 03 2019 APPENDIX A STRALIS NP CURSOR CNG LNG...
Страница 236: ...Printed 692 68 697 5 Ed Base 03 2019...
Страница 238: ...4 NEW STRALIS MY2016 GUIDELINES FOR BODYBUILDERS STRALIS NP CURSOR CNG LNG Printed 692 68 697 5 Ed Base 03 2019...
Страница 254: ...Printed 692 68 697 5 Ed Base 03 2019...