Getting started
Connection
4-1
4 Getting
started
4.1 Connection
►
Connect the functional earth
►
Connect the yellow AS-i cable for every master
►
Connect the 24 V supply
►
Connect the Profibus cable to the fieldbus master
4.2
Set up the AS-i master
►
Connect the addressed AS-i slaves to the yellow AS-i cable
►
Apply voltage
►
If correctly addressed slaves are connected:
controllere menu [Config All] (
→
basic manual)
►
If no slave is connected:
controllere menu [Easy Startup](
→
basic manual)
4.3
Set up Profibus DPV1
►
Controllere menu "Fieldbus Setup": set the Profibus address
(
→
page
, chapter ‘Set the parameters of the fieldbus interface in the controllere
’
)
►
Copy the GSD file from the
ifm
CD (folder "gateway") to the suitable directory of the
corresponding fieldbus configuration program
►
Define the I/O areas and the system behaviour in the fieldbus configuration program
►
Save the configuration
►
Transfer the configuration to the DPV1 master
►
Start the DPV1 master
Содержание Ecomat 300 AC1355
Страница 8: ...8 15 Terms abbreviations 15 1 16 Index 16 1 ...
Страница 12: ...On this manual Overview where is what 1 4 ...
Страница 14: ...Safety instructions Functions and features 2 2 ...
Страница 16: ...System requirements Required accessories 3 2 ...
Страница 18: ...Getting started Set up Profibus DPV1 4 2 ...
Страница 24: ...Menu Main menu Fieldbus Setup 6 4 ...
Страница 52: ...Set up Finish set up 7 28 ...
Страница 76: ...DP module 7 Command channel Module 7 command 63dec 3Fhex no operation command without function 8 24 ...
Страница 226: ...The DPV1 command channel DPV1 command 105dec 69hex read the device properties of the controllere 11 72 ...
Страница 238: ...Technical data Profibus DP interface 13 2 ...
Страница 246: ...Terms abbreviations 15 6 ...
Страница 248: ...Index 16 2 System Save parameters 12 10 Target 15 5 TFR Register 14 2 Troubleshooting 14 1 Watchdog 15 5 ...