7-11
Boom cylinder
Raise
Lower
Roll in
Roll out
90
0.5m
0.5m
Roll in
Roll out
Arm cylinder
Bucket cylinder
HYDRAULIC CYLINDER CYCLE TIME
Measure the cycle time of the boom,
standard arm, and standard bucket
cylinders.
Preparation
To measure the cycle time of the boom
cylinders:
With the arm rolled out and the empty
bucket rolled out, lower the bucket to the
ground, as shown.
To measure the cycle time of the arm
cylinder.
With the empty bucket rolled in, position
the arm so that it is vertical to the ground.
Lower the boom until the bucket is 0.5 m
above the ground.
To measure the cycle time of the bucket
cylinder.
The empty bucket should be positioned
at midstroke between roll-in and roll-out,
so that the sideplate edges are vertical to
the ground.
Keep the hydraulic oil temperature at
50
Ü
5˚C.
Measurement
Select the following switch positions.
Power mode switch : P mode
To measure cylinder cycle times.
Boom cylinders.
Measure the time it takes to raise the
boom, and the time it takes to lower the
boom. To do so, position the boom at
one stroke end then move the control
lever to the other stroke end as quickly
as possible.
Arm cylinder.
Measure the time it takes to roll in the
arm, and the time it takes to roll out the
arm. To do so, position the bucket at
one stroke end, then move the control
lever to the other stroke end as quickly
as possible.
9)
(1)
(2)
刮
刯
到
刱
(3)
刮
余
刯
-
-
300L7MS07
Содержание HX430L
Страница 11: ...SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 10 ...
Страница 161: ...4 6 MEMORANDUM HYUNDAI HEAVY INDUSTRIES CO LTD CONSTRUCTION EQUIPMENT DIV ...
Страница 205: ...4 50 No of pin Receptacle connector female Plug connector male 14 1 7 6 14 MG610406 KET SDL CONNECTOR 13 ...
Страница 528: ...8 88 Assemble relief valve assy 45 using torque wrench ÂTightening torque 26Ü2 6 kgfÂm 188Ü18 8 lbfÂft 31 43098TM95 ...
Страница 548: ...8 108 Remove lock nut 22 and then boot 23 14 36078RL14 2507ARL10 ...
Страница 559: ...8 119 14 15 3 Install cover 3 to body 1 and tighten bolts 14 Torque 10 12 5 kgf m 72 3 90 4 lbf ft 7 21078DA10 ...
Страница 589: ...8 149 1 STRUCTURE GROUP 11 WORK EQUIPMENT B SECTION C SECTION B SECTION A C C A B A 21078DA 44 ...