5-2
SYSTEM DIAGRAM
Travel speed
Power boost
Main pump
Pilot pump
Engine
ECM
CAN #1
Arm 1
Boom 2
Swing
Travel(RH)
Boom 1
Arm 2
Travel(LH)
MCV
RH control
lever
LH control
lever
One touch
decel button
Power boost
button
Horn button
Option
button
Work
pressure
Travel
pressure
SOLENOID VALVE
Attachment
pressure(opt)
Attachment
conflux(opt)
Attachment
safety(opt)
Arm regen
Attachment pilot
pressure
EPPR VALVE
Boom priority
EPPR
Attachment
flow EPPR
MCU
pressure
switch
EPPR
pressure
Overload
pressure
sensor
SL
SR
Swing
pressure
AO
AI
Arm in/out
& Bucket in
pressure
BI
Boom up
pressure
BD
Work tool
Cluster
CAN #2
Pressure signal
Pressure signal
Pressure signal
Drive signal
Pressure signal
Signal
Drive signal
Normal
CN-16
Emergency
CN-16A
CN-16B
Pump power
shift EPPR
Boom cylinder
Shuttle
block
Switch signal
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
Camera
Haptic controller
Option
Bucket
PS
Arm in
CLUSTER
AIRCON
OFF
PS
Negacon 1
pressure
Negacon 2
pressure
BU
PS
Boom
down
pressure
pressure
switch
330L5MS01
Содержание HX430L
Страница 11: ...SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 10 ...
Страница 161: ...4 6 MEMORANDUM HYUNDAI HEAVY INDUSTRIES CO LTD CONSTRUCTION EQUIPMENT DIV ...
Страница 205: ...4 50 No of pin Receptacle connector female Plug connector male 14 1 7 6 14 MG610406 KET SDL CONNECTOR 13 ...
Страница 528: ...8 88 Assemble relief valve assy 45 using torque wrench ÂTightening torque 26Ü2 6 kgfÂm 188Ü18 8 lbfÂft 31 43098TM95 ...
Страница 548: ...8 108 Remove lock nut 22 and then boot 23 14 36078RL14 2507ARL10 ...
Страница 559: ...8 119 14 15 3 Install cover 3 to body 1 and tighten bolts 14 Torque 10 12 5 kgf m 72 3 90 4 lbf ft 7 21078DA10 ...
Страница 589: ...8 149 1 STRUCTURE GROUP 11 WORK EQUIPMENT B SECTION C SECTION B SECTION A C C A B A 21078DA 44 ...