3-12
When carrying out the combined operation of swing and arm of the left control valve, the swing
speed can be lowered than operating speed of arm.
PSp pressure from the swing shuttle block change the swing priority spool and decreases the oil flow
rate to the next section to make the swing operation more preferential.
This is called the swing priority system. For details, refer to page 2-35.
7. SWING PRIORITY SYSTEM
PS
(P4)
(P3)
N2
Pca
Dr3
P2c2
Ba
Aa
PAa
PBa
Bo
Ao
PAo
PBo
(Ck2)
Drb
PBb2
PSp
Dra
Bs
As
PAs
PBs
Dr4
Pns
Br
Ar
PAr
PBr
R3
TRAVEL(RH)
SWING
BOOM 2
T1
Pa
P2
P1 P1g
P2g
R4
(PTb)
PS
PL1
Py
PBL
PAL
PBb
PAb
Ab
Bb
P2c1
Dr3'
PBc
PAc
PAcs
Bc
Ac
PBa2
PAa2
Pcb
N1
OPTION
ARM 1
ARM 2
BUCKET
BOOM 1
TRAVEL(LH)
PS
PS
PS
PS
PS
A
B
C
TRAVEL
P
T
RCV PEDAL
(2)
PBr
(1)
PAr
(4)
PBL
(3)
PAL
BOOM
P
T
BUCKET
ARM
P
T
SWING
c
e2
d1
h1
h2
P2c1
PAb
(4)
PBc
Pca
PAc
PAcs
PBb2
PBb
PAa2
P2c2
PAa
PBa2
PBa
PBs
PAs
PSp
Dr#,dr#
T
LINE FILTER
P3
P2
P1
P4
Pns
(MCV)
PL1
(MCV)
P
(T/Joint)
A1
A2
A4
A5
SH
(2)
(1)
(3)
(4)
(2)
(3)
(1)
HYDRAULIC TANK
SWING
PRIORITY
SPOOL
TRAVEL MOTOR
SWING MOTOR
ARM
CYLINDER
BUCKET
CYLINDER
BOOM
CYLINDER
PILOT
PUMP
Px
P
BL
AL
PG(S/Motor)
Pa(MCV)
Psv1(M/PUMP)
P(MCV)
B
a
b
d
e
f
g
h
j
PUMP
A1
PUMP
A2
A
D
E
F
G
H
J
380L3HC08
Содержание HX430L
Страница 11: ...SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 10 ...
Страница 161: ...4 6 MEMORANDUM HYUNDAI HEAVY INDUSTRIES CO LTD CONSTRUCTION EQUIPMENT DIV ...
Страница 205: ...4 50 No of pin Receptacle connector female Plug connector male 14 1 7 6 14 MG610406 KET SDL CONNECTOR 13 ...
Страница 528: ...8 88 Assemble relief valve assy 45 using torque wrench ÂTightening torque 26Ü2 6 kgfÂm 188Ü18 8 lbfÂft 31 43098TM95 ...
Страница 548: ...8 108 Remove lock nut 22 and then boot 23 14 36078RL14 2507ARL10 ...
Страница 559: ...8 119 14 15 3 Install cover 3 to body 1 and tighten bolts 14 Torque 10 12 5 kgf m 72 3 90 4 lbf ft 7 21078DA10 ...
Страница 589: ...8 149 1 STRUCTURE GROUP 11 WORK EQUIPMENT B SECTION C SECTION B SECTION A C C A B A 21078DA 44 ...