6-40
GROUP 4 MECHATRONICS SYSTEM
CN-75
1
2
PUMP EPPR VALVE
9
CN-52
8
18
9
10
10
MCU
FUSE
NO.4
CN-1
Wiring diagram
1. ALL ACTUATORS SPEED ARE SLOW
Boom, Arm, Bucket, Swing and travel speed are slow, but engine speed is good.
Spec : P-mode 1700
佳
50 rpm S -mode 1600
佳
50 rpm E-mode 1500
佳
50 rpm
Before carrying out below procedure, check all the related connectors are properly inserted and
fault code on the cluster.
INSPECTION PROCEDURE
侍
侍
侍
1)
SPEC : 100~700 mA
See TEST 2
SPEC : 2~25 kgf/cm
2
See TEST 3
SPEC : 15~25
̫
(20˚C)
See TEST 1
Check electric
current at EPPR
valve
Check resistance
at EPPR valve
Check pressure
at EPPR valve
YES
YES
YES
YES
NO
NO
NO
NO
Cause
Remedy
Defective
hydraulic system
Defective
EPPR valve
Defective MCU
Short circuit or
poor connection
between CN-52
-CN-75
Defective EPPR
valve
Replace
Replace
Check & repair
wire harness or
between CN-52
-CN-75
Replace
380L6MS01
Check if HCESPN
140 active fault
display on the LCD
Содержание HX430L
Страница 11: ...SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 10 ...
Страница 161: ...4 6 MEMORANDUM HYUNDAI HEAVY INDUSTRIES CO LTD CONSTRUCTION EQUIPMENT DIV ...
Страница 205: ...4 50 No of pin Receptacle connector female Plug connector male 14 1 7 6 14 MG610406 KET SDL CONNECTOR 13 ...
Страница 528: ...8 88 Assemble relief valve assy 45 using torque wrench ÂTightening torque 26Ü2 6 kgfÂm 188Ü18 8 lbfÂft 31 43098TM95 ...
Страница 548: ...8 108 Remove lock nut 22 and then boot 23 14 36078RL14 2507ARL10 ...
Страница 559: ...8 119 14 15 3 Install cover 3 to body 1 and tighten bolts 14 Torque 10 12 5 kgf m 72 3 90 4 lbf ft 7 21078DA10 ...
Страница 589: ...8 149 1 STRUCTURE GROUP 11 WORK EQUIPMENT B SECTION C SECTION B SECTION A C C A B A 21078DA 44 ...