6-65
Wiring diagram
SPEC
Starting switch ON : 24
Ü
1V
Starting switch OFF : 0V
See TEST 18
SPEC: 15-35
̫
See TEST 19
Is voltage between
CN-88(2)-GND
normal?
Check resistance
between CN-51
(18)-GND
Check resistance
between CN-88
(1)-(2)
Short circuit or poor
connection between
CN-88(1)-CN-52 (2)
Defective power
max. solenoid valve
Check hydraulic
system
Short circuit or poor
connection between
CN-51(18)-CS-29
Short circuit or poor
connection between
CN-88(2)-
Fuse No. 26
Repair or replace
Repair or replace
Repair or replace
Repair or replace
14. MALFUNCTION OF POWER MAX
Fault code : HCESPN 166, FMI 4 or 6
Before carrying out below procedure, check all the related connectors are properly inserted.
INSPECTION PROCEDURE
侍
1)
MCU
CS-29
2
CN-52
18
CN-51
CN-88
5
CN-4
NO.26
2
1
6
2
1
POWER MAX SOLENOID
FUSE
POWER MAX SWITCH
Cause
Remedy
YES
YES
NO
NO
380L6MS04
SPEC : Power max button pressed ON : 0
̫
Power max button released OFF :
â
̫
余
YES
NO
Содержание HX430L
Страница 11: ...SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 10 ...
Страница 161: ...4 6 MEMORANDUM HYUNDAI HEAVY INDUSTRIES CO LTD CONSTRUCTION EQUIPMENT DIV ...
Страница 205: ...4 50 No of pin Receptacle connector female Plug connector male 14 1 7 6 14 MG610406 KET SDL CONNECTOR 13 ...
Страница 528: ...8 88 Assemble relief valve assy 45 using torque wrench ÂTightening torque 26Ü2 6 kgfÂm 188Ü18 8 lbfÂft 31 43098TM95 ...
Страница 548: ...8 108 Remove lock nut 22 and then boot 23 14 36078RL14 2507ARL10 ...
Страница 559: ...8 119 14 15 3 Install cover 3 to body 1 and tighten bolts 14 Torque 10 12 5 kgf m 72 3 90 4 lbf ft 7 21078DA10 ...
Страница 589: ...8 149 1 STRUCTURE GROUP 11 WORK EQUIPMENT B SECTION C SECTION B SECTION A C C A B A 21078DA 44 ...