6-69
TEST PROCEDURE
Test 20 : Check voltage at CN-52 (1) and
ground.
Prepare 1 piece of thin sharp pin, steel or
copper.
Inser t prepared pin to rear side of
connectors : One pin to (1) of CN-52.
Starting switch ON.
Check voltage as figure.
MCU
CN-51
CN-52
Female
CN-52
1
2
3
4
5
6
7
8
9
10
31
32
33
34
36
37
38
39
40
11
21
20
30
Multimeter
GROUND
PIN
1
(1)
刮
刯
到
刱
2)
SPEC : Starting switch ON : 24
佳
2 V
300L6MS22
Содержание HX430L
Страница 11: ...SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 10 ...
Страница 161: ...4 6 MEMORANDUM HYUNDAI HEAVY INDUSTRIES CO LTD CONSTRUCTION EQUIPMENT DIV ...
Страница 205: ...4 50 No of pin Receptacle connector female Plug connector male 14 1 7 6 14 MG610406 KET SDL CONNECTOR 13 ...
Страница 528: ...8 88 Assemble relief valve assy 45 using torque wrench ÂTightening torque 26Ü2 6 kgfÂm 188Ü18 8 lbfÂft 31 43098TM95 ...
Страница 548: ...8 108 Remove lock nut 22 and then boot 23 14 36078RL14 2507ARL10 ...
Страница 559: ...8 119 14 15 3 Install cover 3 to body 1 and tighten bolts 14 Torque 10 12 5 kgf m 72 3 90 4 lbf ft 7 21078DA10 ...
Страница 589: ...8 149 1 STRUCTURE GROUP 11 WORK EQUIPMENT B SECTION C SECTION B SECTION A C C A B A 21078DA 44 ...