6-67
Wiring diagram
SPEC : 20~30V
Starting switch ON
Check resistance
between
CN-133(1)-(2)
Short circuit or poor
connection between
CN-52(35)-CN-133
(1) or CN-52(34)-
CN-133(2)
Defective EPPR
valve
Repair or replace
Repair or replace
15. MALFUNCTION OF BOOM PRIORITY EPPR VALVE
Fault code : HCESPN 141, FMI 5 or 6
Before carrying out below procedure, check all the related connectors are properly inserted.
INSPECTION PROCEDURE
侍
1)
CN-133
1
2
BOOM PRIORITY
EPPR VALVE
35
CN-52
34
MCU
Cause
Remedy
YES
NO
300L6MS23
余
Содержание HX430L
Страница 11: ...SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 10 ...
Страница 161: ...4 6 MEMORANDUM HYUNDAI HEAVY INDUSTRIES CO LTD CONSTRUCTION EQUIPMENT DIV ...
Страница 205: ...4 50 No of pin Receptacle connector female Plug connector male 14 1 7 6 14 MG610406 KET SDL CONNECTOR 13 ...
Страница 528: ...8 88 Assemble relief valve assy 45 using torque wrench ÂTightening torque 26Ü2 6 kgfÂm 188Ü18 8 lbfÂft 31 43098TM95 ...
Страница 548: ...8 108 Remove lock nut 22 and then boot 23 14 36078RL14 2507ARL10 ...
Страница 559: ...8 119 14 15 3 Install cover 3 to body 1 and tighten bolts 14 Torque 10 12 5 kgf m 72 3 90 4 lbf ft 7 21078DA10 ...
Страница 589: ...8 149 1 STRUCTURE GROUP 11 WORK EQUIPMENT B SECTION C SECTION B SECTION A C C A B A 21078DA 44 ...