2-55
Operating principle
When one of the RCV lever (1) is set to the operation position, the each spool is shifted to left
or right and the pilot oil flow is blocked. Then the pilot oil go to SH of the time delay valve (3).
This pressure moves spool (5) to the leftward against the force of the spring(8), so pilot pump
charged oil (P3) goes to the chamber G through port PG.
This pressure is applied to move the piston (6) to the upward against the force of the spring (9).
Thus, it releases the brake force.
Θ
a.
9
6
G
PG
11
D
8
5
3
10 7
P4=P3
SH
1
12
P3
2
4
2
1 Swing control lever
2 Main control valve
3 Time delay valve
4 Pilot pump
5 Spool
6 Piston
7 Poppet
8 Spring
9 Spring
10 Orifice
11 Spring
36072SM12
Содержание HX430L
Страница 11: ...SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 10 ...
Страница 161: ...4 6 MEMORANDUM HYUNDAI HEAVY INDUSTRIES CO LTD CONSTRUCTION EQUIPMENT DIV ...
Страница 205: ...4 50 No of pin Receptacle connector female Plug connector male 14 1 7 6 14 MG610406 KET SDL CONNECTOR 13 ...
Страница 528: ...8 88 Assemble relief valve assy 45 using torque wrench ÂTightening torque 26Ü2 6 kgfÂm 188Ü18 8 lbfÂft 31 43098TM95 ...
Страница 548: ...8 108 Remove lock nut 22 and then boot 23 14 36078RL14 2507ARL10 ...
Страница 559: ...8 119 14 15 3 Install cover 3 to body 1 and tighten bolts 14 Torque 10 12 5 kgf m 72 3 90 4 lbf ft 7 21078DA10 ...
Страница 589: ...8 149 1 STRUCTURE GROUP 11 WORK EQUIPMENT B SECTION C SECTION B SECTION A C C A B A 21078DA 44 ...