5-7
GROUP 4 POWER BOOST SYSTEM
Main pump
Pilot pump
Engine
ECM
CAN #1
MCU
Cluster
Main control valve
Pressure signal
Main relief
valve
LH control
lever
Power boost
button
Power boost
solenoid valve
Power mode sw signal
Signal
Drive signal
Pump power
shift EPPR
Power max button signal
PS
PS
Power max
pilot lamp
Normal
CN-16
Emergency
CN-16A
CN-16B
Haptic controller
CLUSTER
AIRCON
OFF
CAN #2
pressure
switch
pressure
switch
Arm 1
Boom 2
Swing
Travel(RH)
Boom 1
Arm 2
Travel(LH)
Option
Bucket
When the power boost switch on the left control lever knob is pushed ON, the power mode is set P
mode and maximum digging power is increased by 10 %.
When the power boost function is activated, the power boost solenoid valve pilot pressure raises the
set pressure of the main relief valve to increase the digging power.
余
余
When the auto power boost is set to Enable and power mode is set to P mode on the cluster, the
digging power is automatically increased as working conditions by the MCU. It is operated max 8
seconds.
330L5MS06
Description
Condition
Function
Activated
Power boost switch : ON
Accel dial : over 8
- Power mode : P
- Accel dial power : 9
- Power boost solenoid : ON
- Power boost pilot lmap : ON
- Operating time : max 8 seconds
Canceled
Power boost switch : OFF
- Pre-set power mode
- Power boost solenoid : OFF
- Power boost pilot lamp : OFF
侍
Содержание HX430L
Страница 11: ...SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 10 ...
Страница 161: ...4 6 MEMORANDUM HYUNDAI HEAVY INDUSTRIES CO LTD CONSTRUCTION EQUIPMENT DIV ...
Страница 205: ...4 50 No of pin Receptacle connector female Plug connector male 14 1 7 6 14 MG610406 KET SDL CONNECTOR 13 ...
Страница 528: ...8 88 Assemble relief valve assy 45 using torque wrench ÂTightening torque 26Ü2 6 kgfÂm 188Ü18 8 lbfÂft 31 43098TM95 ...
Страница 548: ...8 108 Remove lock nut 22 and then boot 23 14 36078RL14 2507ARL10 ...
Страница 559: ...8 119 14 15 3 Install cover 3 to body 1 and tighten bolts 14 Torque 10 12 5 kgf m 72 3 90 4 lbf ft 7 21078DA10 ...
Страница 589: ...8 149 1 STRUCTURE GROUP 11 WORK EQUIPMENT B SECTION C SECTION B SECTION A C C A B A 21078DA 44 ...