UPS5000-E-(350 kVA-800 kVA)
User Manual (50 kVA Power Modules)
3 Installation
Issue 05 (2018-01-08)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
81
Figure 3-29
Mounting hole dimensions for the 600 kVA UPS (unit: mm)
Step 2
Drill cabinet mounting holes in channel steel by using a hammer drill.
Step 3
Use a pallet truck to move the cabinet to the installation position.
Step 4
Use common M12x45 bolts to secure the cabinets into the mounting holes in the channel steel
and tighten the bolts.
Step 5
Install the front, rear, left, and right anchor baffle plates.
----End
3.2.2 Installing a UPS (800 kVA)
3.2.2.1 Installing the UPS on the Ground
Determining the UPS Installation Position
Ensure that the installation ground is flat.
The marking-off template is delivered with the UPS.
Step 1
Determine the cabinet installation positions on the ground based on holes in the marking-off
template for ground installation.
A: mounting holes on the channel steel
B: mounting holes on the floor