![horsch 80910205 Скачать руководство пользователя страница 172](http://html1.mh-extra.com/html/horsch/80910205/80910205_operating-instructions-manual_2164139172.webp)
1
2
6
5
4
3
15 Tilting the tank installation
The complete tank installation can be tilted to the back
for repair work on the carrier vehicle.
Tilt the tank installation and the fresh
water tank only when empty!
• Remove the rear screws for tower support (1) (right
and left).
• Unscrew the left and right nuts (2) from the front
tank support.
• Loosen the connecting hoses (3) and (4) to the
illuviation valve.
• Loosen the connecting hoses (5) and (6).
• Disconnect all electric plug connections (7) and (8).
• Loosen both hose clamps (9) on the pressure filter.
• Drain the fresh water tank, loosen the clamp (10).
• Carefully lift the tank installation at the front by the
plates (11) for approx. 70 cm, using appropriate
lifting gear.
• Insert a supporting device at a suitable place.
Never access the area under the raised
tank installation without a safe support.
172
Содержание 80910205
Страница 2: ......
Страница 8: ...8...
Страница 39: ...04002623 04003745 04003747 04002625 04002626 39...
Страница 44: ...44...
Страница 82: ...82...
Страница 164: ...14 11 Manual transmission coolant circuit 1 Transmission lubrication pump 2 Filter 3 Transmission oil cooler 1 3 2 164...
Страница 173: ...11 7 8 9 10 173...
Страница 188: ...188...
Страница 216: ...216...
Страница 217: ......