2 Equipment Description
2.27 EUCN Cable System
162
HPM High-Performance Process Manager Service
R688
Honeywell
December 2020
Control Firewall status indicators
Control Firewall Startup
The following table summarizes the stages the CF9 goes through after power is applied to its IOTA
during startup. The CF9 repeats these stages every time power is cycled Off/On or the pins on its reset
pad are shorted.
Stage
Description
1
Power Light Emitting Diode (LED) lights (green)
2
Status LED is red while the CF9 runs its power-on self test (POST).
3
When the CF9 POST completes, the Status LED turns green and the FTE
port LEDs blink green and off for all connected ports when there is traffic, and
remain steady green for connected ports when there is no traffic. The LEDs
for unconnected FTE ports are off.
CF9 LED Descriptions
The following illustration and table identify and describe the indications associated with the LEDs on the
CF9.
LED
State
Off
Green
Red
Blinking
green
Green with
brief flicker
Power
No Power
Power On
N/A
N/A
N/A
Status
No Power of
Fault
Normal
Operation
Running
POST
*See Note
N/A
Downlink
No Power or
Link Present,
N/A
Link
Too Many
Содержание HPM
Страница 8: ...Symbol Definitions viii HPM High Performance Process Manager Service R688 Honeywell December 2020 ...
Страница 178: ......
Страница 300: ......
Страница 390: ......
Страница 396: ...5 UCN Exerciser 5 5 Test Operation 396 HPM High Performance Process Manager Service R688 Honeywell December 2020 ...
Страница 400: ...5 UCN Exerciser 5 6 Analyzing Results 400 HPM High Performance Process Manager Service R688 Honeywell December 2020 ...
Страница 496: ...9 Spare Parts 9 3 UCN EUCN Parts 496 HPM High Performance Process Manager Service R688 Honeywell December 2020 ...
Страница 497: ......
Страница 498: ...Honeywell Process Solutions 1860 W Rose Garden Lane Phoenix AZ 85027 USA ...