3 UCN Status Displays
3.4 Display Operation
200
HPM High-Performance Process Manager Service
R688
Honeywell
December 2020
UCN CABLE STATUS Target
Selection of the
UCN CABLE STATUS
target on the UCN Status display as shown in the following
figure invokes additional targets at the bottom of the display to change the active UCN cable or
enable/disable automatic cable swapping.
Figure 101 UCN Status Display
– UCN CABLE STATUS Target Selected
UCN COMM STATUS target
If a UCN node is selected after the
UCN COMM STATUS
target is selected, the
ENABLE SWAP
and
DISABLE SWAP
targets are removed at the bottom of the display, and the
TEST/SEL CABLE A
and
TEST/SEL CABLE B
targets are replaced by the
BACKUP CABLE TST
target as shown in Figure
BACKUP CABLE TST target
If the
BACKUP CABLE TST
target is selected, the UCN node will perform the Backup Cable test.
Содержание HPM
Страница 8: ...Symbol Definitions viii HPM High Performance Process Manager Service R688 Honeywell December 2020 ...
Страница 178: ......
Страница 300: ......
Страница 390: ......
Страница 396: ...5 UCN Exerciser 5 5 Test Operation 396 HPM High Performance Process Manager Service R688 Honeywell December 2020 ...
Страница 400: ...5 UCN Exerciser 5 6 Analyzing Results 400 HPM High Performance Process Manager Service R688 Honeywell December 2020 ...
Страница 496: ...9 Spare Parts 9 3 UCN EUCN Parts 496 HPM High Performance Process Manager Service R688 Honeywell December 2020 ...
Страница 497: ......
Страница 498: ...Honeywell Process Solutions 1860 W Rose Garden Lane Phoenix AZ 85027 USA ...