2 Equipment Description
2.27 EUCN Cable System
154
HPM High-Performance Process Manager Service
R688
Honeywell
December 2020
Table 20 CF9 switch/uplink port failure
Error scenario
UCN COMM STATUS
(EHPM)
UCN CABLE
STATUS/FTE
CABLE STATUS
$FTESTS2
displays
(ENB)
$FTESTS2
displays
(EHPM
connected to
CF9 with cable
faults)
If CF9 A is
powered down or
CF9 A Uplink
Port has a
problem
A
SIL
B
SIL
A
NSY
B
NSY
FAIL/FAIL
UCN: OK/BACKUP
LCN: OK/BACKUP
FTE composite status
A->A
A->B
B->A
B->B
SIL
SIL
OK
OK
If CF9 B is
powered down
or CF9 B Uplink
Port has a
problem
A
SIL
B
SIL
A
NSY
B
NSY
FAIL/FAIL
UCN: OK/BACKUP
LCN: OK/BACKUP
FTE composite status
A->A
A->B
B->A
B->B
OK
OK
SIL
SIL
If both CF9 A and
CF9 B is
powered down/
both CF9 A and
CF9 B uplink
ports have a
problem
A
SIL
B
SIL
A
NSY
B
NSY
OK/OK
UCN:
OFFNET/OFFNET
LCN: OK/BACKUP
FTE composite status
A->A
A->B
B->A
B->B
OK
OK
OK
OK
Table 21 ES-T/ESVT FTE Cable Faults
Error scenario
UCN COMM STATUS
UCN CABLE
STATUS/FTE
CABLE STATUS
$FTESTS2
displays
(ENB)
$FTESTS2
displays
(L2 node that
has a FTE Cable
A problem)
If FTE Cable A
on an L2 node
connected to a
FTE L2 Switch
has a problem
(for example, ES-
T FTE Cable A
fault)
A
SIL
B
SIL
A
NSY
B
NSY
FAIL/FAIL
UCN: N/A
LCN: OK/BACKUP
FTE composite status
A->A
A->B
B->A
B->B
SIL
SIL
OK
OK
Содержание HPM
Страница 8: ...Symbol Definitions viii HPM High Performance Process Manager Service R688 Honeywell December 2020 ...
Страница 178: ......
Страница 300: ......
Страница 390: ......
Страница 396: ...5 UCN Exerciser 5 5 Test Operation 396 HPM High Performance Process Manager Service R688 Honeywell December 2020 ...
Страница 400: ...5 UCN Exerciser 5 6 Analyzing Results 400 HPM High Performance Process Manager Service R688 Honeywell December 2020 ...
Страница 496: ...9 Spare Parts 9 3 UCN EUCN Parts 496 HPM High Performance Process Manager Service R688 Honeywell December 2020 ...
Страница 497: ......
Страница 498: ...Honeywell Process Solutions 1860 W Rose Garden Lane Phoenix AZ 85027 USA ...