7 IOP Calibration Procedures
7.5 Nonredundant HLAI IOP Calibration Procedure
R688
HPM High-Performance Process Manager Service
447
December 2020
Honeywell
Figure 216 Nonredundant HLAI Calibration Connections
User Inpu t Device
Volta ge Inp ut:
Cu rrent Inp ut:
0-5 volt
1-5 volt
4-20 mA
10-5 0 mA
5 V
5 V
VCAL Vo ltage Source
H
R3
ANALOG IN PUT H IGH LEVEL /SF1 IN PUT MU - TAIHO2
TER MINATION ASSY. N O. 513 04453 - 1 00 R EV
B
CAL
S1
1 (+)
2 (-)
TB1
TB2
TB3
VCAL
J1
DATE C OD E
+24 V
R1
R2
+
-
Volta ge
Source
5 V
5 V
T
B
4
Step
Action
4
Short the two calibration pads at the upper-left corner of the HLAI FTA as shown in
Figure 215 to start the calibration. For the Galvanically Isolated FTAs, two pins in the
Marshalling Panel connector are shorted together.
5
Ensure that the calibration target on the HLAI Detail Status display has changed back
to
ENABLE CALIBRATION
, indicating that the zero and span calibration process has
completed. Check for the Soft failure
CALIB ABORT
, which indicates bad calibration.
6
Disconnect the calibration voltage source wiring.
7
Inform the operator that the HLAI can be returned to on-line operation.
Содержание HPM
Страница 8: ...Symbol Definitions viii HPM High Performance Process Manager Service R688 Honeywell December 2020 ...
Страница 178: ......
Страница 300: ......
Страница 390: ......
Страница 396: ...5 UCN Exerciser 5 5 Test Operation 396 HPM High Performance Process Manager Service R688 Honeywell December 2020 ...
Страница 400: ...5 UCN Exerciser 5 6 Analyzing Results 400 HPM High Performance Process Manager Service R688 Honeywell December 2020 ...
Страница 496: ...9 Spare Parts 9 3 UCN EUCN Parts 496 HPM High Performance Process Manager Service R688 Honeywell December 2020 ...
Страница 497: ......
Страница 498: ...Honeywell Process Solutions 1860 W Rose Garden Lane Phoenix AZ 85027 USA ...