2 Equipment Description
2.27 EUCN Cable System
146
HPM High-Performance Process Manager Service
R688
Honeywell
December 2020
Table 13 Crossover Cable Faults
Error scenario
$FTESTS2 displays
(all EUCN nodes)
If the top level cross cable connecting
the Yellow and Green switches are
correctly functioning.
If the top level cross cable connecting
the Yellow and Green Switches is
removed or has a problem.
Table 14 EUCN Crossed Cable Faults
Error scenario
$FTESTS2 displays
(this EHPM)
$FTESTS2 displays
(all other EUCN nodes)
If the FTE cable A and
FTE cable B cables on an
EHPM are switched - FTE
A (yellow) to the Green
Switch and FTE B (green)
to the Yellow switch
If the FTE cable A is
removed or has a problem
on an EHPM with the
crossed cables connected
If the FTE cable B is
removed or has a problem
on an EHPM with the
crossed cables connected
Top Level Cross cable
between the Yellow and
Green Switches is
disconnected
If the FTE cable A and B
on an EHPM are
connected to the correct
switch.
Содержание HPM
Страница 8: ...Symbol Definitions viii HPM High Performance Process Manager Service R688 Honeywell December 2020 ...
Страница 178: ......
Страница 300: ......
Страница 390: ......
Страница 396: ...5 UCN Exerciser 5 5 Test Operation 396 HPM High Performance Process Manager Service R688 Honeywell December 2020 ...
Страница 400: ...5 UCN Exerciser 5 6 Analyzing Results 400 HPM High Performance Process Manager Service R688 Honeywell December 2020 ...
Страница 496: ...9 Spare Parts 9 3 UCN EUCN Parts 496 HPM High Performance Process Manager Service R688 Honeywell December 2020 ...
Страница 497: ......
Страница 498: ...Honeywell Process Solutions 1860 W Rose Garden Lane Phoenix AZ 85027 USA ...