2 Equipment Description
2.27 EUCN Cable System
R688
HPM High-Performance Process Manager Service
157
December 2020
Honeywell
Also note that in this case – since the secondary is in BACKUP indicating a good connection with the
primary, a swap-over could be initiated and the secondary would take over, view would be restored, and
advanced control would resume.
Figure 73 UCN Status for L1 Switch A down and CF9 B downlink fault
Figure 74 $FTESTS for L1 Switch A down and CF9 B downlink fault
Primary ENIM/ENB
Primary EHPM
Secondary ENIM/ENB
Secondary EHPM
Содержание HPM
Страница 8: ...Symbol Definitions viii HPM High Performance Process Manager Service R688 Honeywell December 2020 ...
Страница 178: ......
Страница 300: ......
Страница 390: ......
Страница 396: ...5 UCN Exerciser 5 5 Test Operation 396 HPM High Performance Process Manager Service R688 Honeywell December 2020 ...
Страница 400: ...5 UCN Exerciser 5 6 Analyzing Results 400 HPM High Performance Process Manager Service R688 Honeywell December 2020 ...
Страница 496: ...9 Spare Parts 9 3 UCN EUCN Parts 496 HPM High Performance Process Manager Service R688 Honeywell December 2020 ...
Страница 497: ......
Страница 498: ...Honeywell Process Solutions 1860 W Rose Garden Lane Phoenix AZ 85027 USA ...