4 Fault Isolation
4.9 HPMM Alphanumeric Display
364
HPM High-Performance Process Manager Service
R688
Honeywell
December 2020
Detailed
Display
Non-Detailed
Display
Description
STRT
STRT
Begin Communications processor firmware based
tests.
T 0D
STRT
Global DRAM EDAC sweep
T 13
STRT
Global DRAM initialization
T 17
STRT
Comm Local RAM destructive pattern test
T 1B
STRT
Comm Local RAM initialization
T 21
STRT
UCN TBC Private RAM destructive pattern test
T 25
STRT
UCN TBC Private RAM Initialization
T 4F
STRT
Initialize the (FW resident) LLC Communications layer
A139
A139
Alive state (file 1, UCN node 39)
Startup/Factory Test mode sequence
If the Factory Test mode had been selected, the Startup sequence would end prior to LLC initialization as
listed in the following table for the Detailed-display mode and non-Detailed Display mode.
Table 69 Alphanumeric Display for Startup/Factory Test Mode Sequence
Detailed
Display
Non-Detailed
Display
Description
STRT
STRT
Begin Communications processor firmware based
tests.
T 0D
STRT
Global DRAM EDAC sweep
T 13
STRT
Global DRAM initialization
T 17
STRT
Comm Local RAM destructive pattern test
T 1B
STRT
Comm Local RAM initialization
T 21
STRT
UCN TBC Private RAM destructive pattern test
T 25
STRT
UCN TBC Private RAM Initialization
T 4C
STRT
Transition to the FW Alive state
AR00
AR00
Alive state (UCN node 00, Right file position)
FTST
FTST
Factor Test mode notification
AR00
AR00
Status is displayed for 1/2 second.
FTST
FTST
Notification is displayed for 1/2 second.
Startup/HPMM failure sequence
An HPMM failure occurs during or after a Startup results in alternating failure and Communications
processor Hard failure code. This is dependent upon whether the Detailed Display mode (switch) is
enabled. The description in the following table is an example of a sequence when a spurious interrupt
failure occurs listing both the Detailed Display mode and non-Detailed Display mode.
Содержание HPM
Страница 8: ...Symbol Definitions viii HPM High Performance Process Manager Service R688 Honeywell December 2020 ...
Страница 178: ......
Страница 300: ......
Страница 390: ......
Страница 396: ...5 UCN Exerciser 5 5 Test Operation 396 HPM High Performance Process Manager Service R688 Honeywell December 2020 ...
Страница 400: ...5 UCN Exerciser 5 6 Analyzing Results 400 HPM High Performance Process Manager Service R688 Honeywell December 2020 ...
Страница 496: ...9 Spare Parts 9 3 UCN EUCN Parts 496 HPM High Performance Process Manager Service R688 Honeywell December 2020 ...
Страница 497: ......
Страница 498: ...Honeywell Process Solutions 1860 W Rose Garden Lane Phoenix AZ 85027 USA ...