8 Periodic Redundancy Tests
8.4 Redundant 8-Channel Analog Output IOPs
462
HPM High-Performance Process Manager Service
R688
Honeywell
December 2020
Status check
Using the IOP Detail Status display, check that the IOPs are currently operating normally, as indicated
by a status of
OK/BKP
. In addition, be sure the following is true.
The outputs are being controlled by IOP A
IOP A and IOP B are synchronized
IOP A is operating normally without Soft failures
IOP B is operating normally without Soft failures
Test procedure
Perform the following steps to test for proper IOP redundancy operation.
Step
Action
1
Begin the test at a convenient time. Disrupt power to IOP B by toggling the IOP’s upper
extractor. The IOP Detail Status display should indicate a status of
OK/NR [S]
briefly,
and then return to a status of
OK/BKP
for the IOPs. Confirm that the field devices are
operating properly by observing the operation of the process, or measure the output
currents reaching the devices.
2
Disconnect the cable to IOP B. The IOP Detail Status display should indicate a status
of
OK/BSF
for the IOPs. Confirm that the field devices are operating properly by
observing the operation of the process, or measure the output currents reaching the
devices.
3
Reconnect the cable to IOP B. The IOP Detail Status display should return to an
OK/BKP
status for the IOPs.
4
Execute a swap so that IOP B has control of the FTAs outputs. The IOP Detail Status
display should indicate a
BKP/OK
status for the IOPs. Check that the IOP Detail Status
display continues to indicate
BKP/OK
status for a period of at least two minutes to
allow the Redundancy Diagnostics to complete with IOP B now controlling the FTA
outputs. Confirm that the output devices are operating properly by observing the
operation of the process, or measuring the output currents reaching the field devices
before and after executing the swap command.
5
Disrupt power to IOP A by toggling the IOP’s upper extractor. The IOP Detail Status
display should indicate a
[S] NR/OK
status briefly, and then return to
BKP/OK
. Confirm
that the output devices are operating properly by observing the operation of the
process, or measuring the output currents reaching the field devices.
6
Disconnect IOP
A’s FTA cable. The IOP Detail Status display should indicate a status
of
BSF/OK
for the IOPs. Confirm that the output devices are operating properly by
observing the operation of the process, or measuring the output currents to the field
devices.
7
Connect IOP
A’s FTA cable. The IOP Detail Status display should return to a
BKP/OK
status for the IOPs.
8
Allow the subsystem to operate against the bias with IOP B controlling the outputs for a
period of time, such as 4 hours. During this period of time, the IOP Detail Status display
should continue to indicate a
BKP/OK
status for the IOPs. Ensure that no Soft failures
are logged into the System Status Real Time Journal. Continue to monitor that the
output devices are operating properly by observing the operation of the process, or
measuring the output currents reaching the field devices
9
Execute a swap command so that IOP A has control of the FTAs outputs. The IOP
Detail Status display should indicate an
OK/BKP
status for the IOPs. Continue to
monitor operation of the output devices with the bias for a period of time, such as 2
hours.
Содержание HPM
Страница 8: ...Symbol Definitions viii HPM High Performance Process Manager Service R688 Honeywell December 2020 ...
Страница 178: ......
Страница 300: ......
Страница 390: ......
Страница 396: ...5 UCN Exerciser 5 5 Test Operation 396 HPM High Performance Process Manager Service R688 Honeywell December 2020 ...
Страница 400: ...5 UCN Exerciser 5 6 Analyzing Results 400 HPM High Performance Process Manager Service R688 Honeywell December 2020 ...
Страница 496: ...9 Spare Parts 9 3 UCN EUCN Parts 496 HPM High Performance Process Manager Service R688 Honeywell December 2020 ...
Страница 497: ......
Страница 498: ...Honeywell Process Solutions 1860 W Rose Garden Lane Phoenix AZ 85027 USA ...